OSHA SearchOSHA records by employer

J & G Construction Services: OSHA inspections and violations

Brooklyn, New York · Other Building Finishing Contractors · NAICS 238390

4inspections
5citation items
$43,092current penalties
Apr 8, 2022last inspection

OSHA has inspected J & G Construction Services 4 times in New York since 2018.

The latest one began on Apr 8, 2022 to follow up on an earlier case, in Brooklyn.

Those inspections ended with 5 citation items: 5 serious.

Penalties were first proposed at $43,092 and still stand at $43,092.

Scaffolds, general requirements comes up most often in these citations: 4 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and J & G Construction Services averages $21,546 (2 cited inspections).

J & G Construction Services: OSHA citation items per year, 2018 to 2022
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

358employers cited

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch J & G Construction Services and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345884027 OPENED APR 8, 2022Closed

Follow-up · Partial · Safety · 3 employees at the site · Closed Apr 21, 2022

328 Nassau Ave, Brooklyn, NY 11222 · Other Building Finishing Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 344662283 OPENED FEB 27, 2020Closed

Referral · Partial · Safety · 6 employees at the site · Closed Jan 16, 2026

535 Grand Street, Brooklyn, NY 11211 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(a)(6) · Scaffolds, general requirements
Serious$9,447$9,447Aug 26, 2020Final
Citation 1, item 2
29 CFR 1926.451(c)(1)(ii) · Scaffolds, general requirements
Serious$9,447$9,447Aug 26, 2020Final
Citation 1, item 3
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$9,447$9,447Aug 26, 2020Final
Citation 1, item 4
29 CFR 1926.452(i)(1) · Rules for each type of scaffold
Serious$9,447$9,447Aug 26, 2020Final

Inspection 344016910 OPENED MAY 16, 2019Closed

Complaint · Partial · Safety · 3 employees at the site · Closed Jul 16, 2024

328 Nassau Ave, Brooklyn, NY 11222 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(f)(6) · Scaffolds, general requirements
Serious$5,304$5,304Nov 13, 2019Final

Inspection 342903671 OPENED JAN 10, 2018Closed

Planned · No inspection · Safety · Closed Jan 29, 2018

1720 Bedford Avenue, Brooklyn, NY 11225 · Other Building Finishing Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(a)(6)

(6) Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design. Non-mandatory appendix A to this subpart contains examples of criteria that will enable an employer to comply with paragraph (a) of this section.

29 CFR 1926.451(c)(1)(ii)

(ii) Guys, ties, and braces shall be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and be repeated vertically at locations of horizontal members every 20 feet (6.1 m) or less thereafter for scaffolds 3 feet (0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91 m) wide. The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 height from the top. Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other).

29 CFR 1926.451(f)(6)

(6) The clearance between scaffolds and power lines shall be as follows: Scaffolds shall not be erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer to exposed and energized power lines than as follows:

29 CFR 1926.452 · Rules for each type of scaffold

Other other building finishing contractors employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.