OSHA SearchOSHA records by employer

J & R Restoration Inc: OSHA inspections and violations

Parker, Colorado · Siding Contractors · NAICS 238170

1inspections
3citation items
$1,932current penalties
Apr 26, 2019last inspection

J & R Restoration Inc has one OSHA inspection on record in Colorado.

OSHA opened it on Apr 26, 2019 as a planned inspection, in Parker.

From that inspection OSHA issued 3 citation items: 3 other-than-serious.

OSHA proposed $3,864 in penalties. After settlements and reviews the total is $1,932, down 50%.

Most often, OSHA cited 1926.451, scaffolds, general requirements (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. J & R Restoration Inc averages $1,932 over 1 cited inspection in that time.

J & R Restoration Inc: OSHA citation items per year, 2019 to 2019
Citation items per year, by inspection date.

Colorado · latest 90 days of OSHA records

138employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Colorado: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Colorado

Checking a subcontractor, a client or your own company? Watch J & R Restoration Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343962353 OPENED APR 26, 2019Closed

Planned · Partial · Safety · 6 employees at the site · Closed Jun 6, 2019

15035 Munich Ave, Parker, CO 80134 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Other-than-serious$1,932$1,932May 22, 2019Final
Citation 1, item 1b
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Other-than-serious$0$0May 22, 2019Final
Citation 1, item 1c
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Other-than-serious$1,932$0May 22, 2019Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(c)(2)

(2) Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.

29 CFR 1926.451(g)(4)(i)

(i) Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(j)(2)

(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.

Other siding contractors employers in Colorado

Alert subscribers get notified of each newly cited employer in Colorado the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.