Inspection 345992267 OPENED MAY 26, 2022Closed
1124 New Britain Avenue, West Hartford, CT 06105 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Hartford, Connecticut · Roofing Contractors · NAICS 238160
OSHA has inspected J.J. Landerman Roofing Co. 5 times in Connecticut since 1991.
The latest one began on May 26, 2022 as a planned inspection, in West Hartford.
Those inspections ended with 13 citation items: 13 serious.
Penalties were first proposed at $12,575 and now stand at $7,085, 44% lower after settlements or reviews.
Fall protection systems comes up most often in these citations: 7 items under 1926.502.
How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and J.J. Landerman Roofing Co. averages $1,960 (1 cited inspection).
Connecticut · latest 90 days of OSHA records
88employers cited
6 of them in the same industry
Get notified the morning OSHA posts each new citation in Connecticut: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Connecticut
Checking a subcontractor, a client or your own company? Watch J.J. Landerman Roofing Co. and get notified the morning OSHA posts a new citation for it.
Watch this company1124 New Britain Avenue, West Hartford, CT 06105 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
16 Progress Circle, Newington, CT 06111 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.501(b)(10) · Fall protection in construction |
Serious | $2,800 | $1,960 | Jul 20, 2016 | Final |
1200 Park Street, Hartford, CT 06106 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.502(f)(1) · Fall protection systems |
Serious | $2,800 | $1,400 | Jul 29, 2010 | Closed |
492 Summer Street, Plantsville, CT 06479 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.150(c)(1)(vi) · Fire protection |
Serious | $750 | $780 | Jun 9, 2009 | Closed |
| Citation 1, item 2a 29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites |
Serious | $1,500 | $705 | Jun 9, 2009 | Closed |
| Citation 1, item 2b 29 CFR 1926.404(f)(6) · Ground-fault protection on job sites |
Serious | $0 | $0 | Jun 9, 2009 | Closed |
| Citation 1, item 3 29 CFR 1926.416(a)(1) · Electrical safety in construction |
Serious | $1,500 | $705 | Jun 9, 2009 | Closed |
| Citation 1, item 4a 29 CFR 1926.502(f)(1)(ii) · Fall protection systems |
Serious | $1,500 | $705 | Jun 9, 2009 | Closed |
| Citation 1, item 4b 29 CFR 1926.502(f)(1)(i) · Fall protection systems |
Serious | $0 | $0 | Jun 9, 2009 | Closed |
| Citation 1, item 4c 29 CFR 1926.502(f)(2)(ii) · Fall protection systems |
Serious | $0 | $0 | Jun 9, 2009 | Closed |
| Citation 1, item 4d 29 CFR 1926.502(f)(4) · Fall protection systems |
Serious | $0 | $0 | Jun 9, 2009 | Closed |
| Citation 1, item 5a 29 CFR 1926.502(h)(1)(i) · Fall protection systems |
Serious | $1,500 | $705 | Jun 9, 2009 | Closed |
| Citation 1, item 5b 29 CFR 1926.502(h)(1)(iii) · Fall protection systems |
Serious | $0 | $0 | Jun 9, 2009 | Closed |
450 Main Street, Hartford, CT 06103 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.59(e)(1) · Hazard communication |
Serious | $225 | $125 | Dec 26, 1991 | Closed |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.150(c)(1)(vi)
(vi) A fire extinguisher, rated not less than 10B, shall be provided within 50 feet of wherever more than 5 gallons of flammable or combustible liquids or 5 pounds of flammable gas are being used on the jobsite. This requirement does not apply to the integral fuel tanks of motor vehicles.
29 CFR 1926.404(b)(1)(i)
(b) Branch circuits—(1) Ground-fault protection—(i) General. The employer shall use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. These requirements are in addition to any other requirements for equipment grounding conductors.
29 CFR 1926.404(f)(6)
(6) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous.
Alert subscribers get notified of each newly cited employer in Connecticut the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.