OSHA SearchOSHA records by employer

J-Two Concrete, Inc.: OSHA inspections and violations

Mt Prospect, Illinois · Poured Concrete Foundation and Structure Contractors · NAICS 238110

3inspections
11citation items
$14,000current penalties
Oct 31, 2023last inspection

OSHA has inspected J-Two Concrete, Inc. 3 times in Illinois since 2005.

The latest one began on Oct 31, 2023 on a referral, in Lake Forest.

Those inspections ended with 11 citation items: 9 serious and 2 other-than-serious.

Penalties were first proposed at $21,062 and now stand at $14,000, 34% lower after settlements or reviews.

Inspections comes up most often in these citations: 3 items under 1926.1412.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and J-Two Concrete, Inc. averages $10,000 (1 cited inspection).

J-Two Concrete, Inc.: OSHA citation items per year, 2005 to 2023
Citation items per year, by inspection date.

Illinois · latest 90 days of OSHA records

416employers cited

Get notified the morning OSHA posts each new citation in Illinois: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Illinois

Checking a subcontractor, a client or your own company? Watch J-Two Concrete, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347072092 OPENED OCT 31, 2023Closed

Referral · Partial · Safety · 11 employees at the site · Closed Mar 12, 2024

300 N Green Bay Rd, Lake Forest, IL 60045 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 2
29 CFR 1926.451(e)(5)(i) · Scaffolds, general requirements
Serious$4,610$3,000Feb 14, 2024Final
Citation 1, item 3
29 CFR 1926.652(a)(1) · Trench protection
Serious$6,452$4,000Feb 14, 2024Final
Citation 1, item 4
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$0$3,000Feb 14, 2024Final

Inspection 334244530 OPENED MAY 9, 2012Closed

Planned · Partial · Safety · 10 employees at the site · Closed Oct 17, 2012

1140 Garfield St., Oak Park, IL 60304 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Other-than-serious$2,000$0Jun 8, 2012Final
Citation 1, item 2
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$2,800$1,400Jun 8, 2012Final
Citation 1, item 3
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$2,000$1,000Jun 8, 2012Final
Citation 1, item 4a
29 CFR 1926.1412(d)(1) · Inspections
Serious$1,600$800Jun 8, 2012Final
Citation 1, item 4b
29 CFR 1926.1412(e)(1) · Inspections
Serious$0$0Jun 8, 2012Final
Citation 1, item 4c
29 CFR 1926.1412(f)(2) · Inspections
Serious$0$0Jun 8, 2012Final
Citation 1, item 5
29 CFR 1926.1417(a) · Operation
Serious$1,600$800Jun 8, 2012Final
Citation 2, item 1
29 CFR 1926.1428(a) · Signal person qualifications
Other-than-serious$0$0Jun 8, 2012Final

Inspection 309265304 OPENED AUG 24, 2005Closed

Programmed other · No inspection · Safety · Closed Sep 26, 2005

W. Camp Mcdonald Rd. & N. Dale Ave., Mt Prospect, IL 60056 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.1412 · Inspections

29 CFR 1926.1412(d)(1)

(d) Each shift. (1) A competent person must begin a visual inspection prior to each shift the equipment will be used, which must be completed before or during that shift. The inspection must consist of observation for apparent deficiencies. Taking apart equipment components and booming down is not required as part of this inspection unless the results of the visual inspection or trial operation indicate that further investigation necessitating taking apart equipment components or booming down is needed. Determinations made in conducting the inspection must be reassessed in light of observations made during operation. At a minimum the inspection must include all of the following:

29 CFR 1926.1412(e)(1)

(e) Monthly. (1) Each month the equipment is in service it must be inspected in accordance with paragraph (d) of this section (each shift).

29 CFR 1926.1417 · Operation

29 CFR 1926.1428 · Signal person qualifications

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

29 CFR 1926.652 · Trench protection

Other poured concrete foundation and structure contractors employers in Illinois

Alert subscribers get notified of each newly cited employer in Illinois the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.