OSHA SearchOSHA records by employer

James Huie: OSHA inspections and violations

Central Point, Oregon · Drywall and Insulation Contractors · NAICS 238310

1inspections
4citation items
$4,708current penalties
Apr 30, 2025last inspection

OSHA has inspected James Huie once in Oregon.

The inspection began on Apr 30, 2025 as a planned inspection, in Central Point.

That inspection ended with 4 citation items: 4 serious.

Penalties were first proposed at $4,708 and still stand at $4,708.

Stairways in construction comes up most often in these citations: 3 items under 1926.1052.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and James Huie averages $4,708 (1 cited inspection).

James Huie: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

388employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch James Huie and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348243007 OPENED APR 30, 2025Closed

Planned · Partial · Safety · 2 employees at the site · Closed Oct 17, 2026

4726/4728 Gebhard Rd, Central Point, OR 97502 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1052(b)(3) · Stairways in construction
Serious$1,177$1,177Jun 30, 2025Final
Citation 1, item 2
29 CFR 1926.1052(c)(7) · Stairways in construction
Serious$1,177$1,177Jun 30, 2025Final
Citation 1, item 3
29 CFR 1926.1052(c)(4) · Stairways in construction
Serious$1,177$1,177Jun 30, 2025Final
Citation 1, item 4
29 CFR OAR 437-001-0765(11)-1
Serious$1,177$1,177Jun 30, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.1052(b)(3)

(3) Treads for temporary service shall be made of wood or other solid material, and shall be installed the full width and depth of the stair.

29 CFR 1926.1052(c)(4)

(4) Midrails, screens, mesh, intermediate vertical members, or equivalent intermediate structural members, shall be provided between the top rail of the stairrail system and the stairway steps.

29 CFR 1926.1052(c)(7)

(7) When the top edge of a stairrail system also serves as a handrail, the height of the top edge shall be not more than 37 inches (94 cm) nor less than 36 inches (91.5 cm) from the upper surface of the stairrail system to the surface of the tread, in line with the face of the riser at the forward edge of the tread.

Other drywall and insulation contractors employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.