OSHA SearchOSHA records by employer

Jason Harper Contracting, LLC: OSHA inspections and violations

Arnold, Missouri · Framing Contractors · NAICS 238130

1inspections
2citation items
$652current penalties
Aug 25, 2017last inspection

OSHA has inspected Jason Harper Contracting, LLC once in Missouri.

The inspection began on Aug 25, 2017 after a complaint, in Arnold.

That inspection ended with 2 citation items: 2 serious.

Penalties were first proposed at $6,519 and now stand at $652, 90% lower after settlements or reviews.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Jason Harper Contracting, LLC averages $652 (1 cited inspection).

Jason Harper Contracting, LLC: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Missouri · latest 90 days of OSHA records

126employers cited

12 of them in the same industry

Get notified the morning OSHA posts each new citation in Missouri: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Missouri

Checking a subcontractor, a client or your own company? Watch Jason Harper Contracting, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342590247 OPENED AUG 25, 2017Closed

Complaint · Partial · Safety · 3 employees at the site · Closed Jul 24, 2018

1721 Engle Dr., Arnold, MO 63010 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Serious$4,346$435Dec 18, 2017Final
Citation 1, item 2
29 CFR 1926.405(a)(2)(ii) · Job-site wiring
Serious$2,173$217Dec 18, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(f)(6)

(6) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(a)(2)(ii)

(2) Temporary wiring—(i) Scope. The provisions of paragraph (a)(2) of this section apply to temporary electrical power and lighting wiring methods which may be of a class less than would be required for a permanent installation. Except as specifically modified in paragraph (a)(2) of this section, all other requirements of this subpart for permanent wiring shall apply to temporary wiring installations. Temporary wiring shall be removed immediately upon completion of construction or the purpose for which the wiring was installed.

Other framing contractors employers in Missouri

Alert subscribers get notified of each newly cited employer in Missouri the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.