OSHA SearchOSHA records by employer

Javier Velazquez: OSHA inspections and violations

Arlington, Texas · Masonry Contractors · NAICS 238140

1inspections
5citation items
$4,276current penalties
Aug 10, 2016last inspection

OSHA has inspected Javier Velazquez once in Texas.

The inspection began on Aug 10, 2016 as a planned inspection, in Arlington.

That inspection ended with 5 citation items: 4 serious and 1 other-than-serious.

Penalties were first proposed at $4,276 and still stand at $4,276.

Scaffolds, general requirements comes up most often in these citations: 3 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Javier Velazquez averages $4,276 (1 cited inspection).

Javier Velazquez: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

Want to know if OSHA cites Javier Velazquez again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 341688026 OPENED AUG 10, 2016Closed

Planned · Partial · Health · 3 employees at the site · Closed Nov 13, 2019

4219 Tiger Lily Lane, Arlington, TX 76005 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.100(a) · Hard hats in construction
Serious$1,604$1,604Sep 8, 2016Final
Citation 1, item 2a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,672$2,672Sep 8, 2016Final
Citation 1, item 2b
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$0$0Sep 8, 2016Final
Citation 1, item 2c
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$0$0Sep 8, 2016Final
Citation 2, item 1
29 CFR 1910.134(a)(2) · Respiratory protection
Other-than-serious$0$0Sep 8, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(a)(2)

(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

Other masonry contractors employers in Texas

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.