OSHA SearchOSHA records by employer

Jazzlyn Hospitality II LLC: OSHA inspections and violations

Keene, New Hampshire · Commercial and Institutional Building Construction · NAICS 236220

1inspections
7citation items
$8,000current penalties
Feb 19, 2020last inspection

OSHA has inspected Jazzlyn Hospitality II LLC once in New Hampshire.

The inspection began on Feb 19, 2020, in Keene.

That inspection ended with 7 citation items: 7 serious.

Penalties were first proposed at $28,336 and now stand at $8,000, 72% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 6 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Jazzlyn Hospitality II LLC averages $8,000 (1 cited inspection).

Jazzlyn Hospitality II LLC: OSHA citation items per year, 2020 to 2020
Citation items per year, by inspection date.

New Hampshire · latest 90 days of OSHA records

55employers cited

Get notified the morning OSHA posts each new citation in New Hampshire: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New Hampshire

Checking a subcontractor, a client or your own company? Watch Jazzlyn Hospitality II LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344640651 OPENED FEB 19, 2020Closed

Unprogrammed other · Complete · Safety · 9 employees at the site · Closed Sep 27, 2022

Key Road, Keene, NH 03431 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(a)(1) · Scaffolds, general requirements
Serious$4,048$4,000Aug 7, 2020Final
Citation 1, item 1b
29 CFR 1926.451(c)(1) · Scaffolds, general requirements
Serious$4,048$0Aug 7, 2020Final
Citation 1, item 1c
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Serious$4,048$0Aug 7, 2020Final
Citation 1, item 1d
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$4,048$0Aug 7, 2020Final
Citation 1, item 5a
29 CFR 1926.451(f)(12) · Scaffolds, general requirements
Serious$4,048$4,000Aug 7, 2020Final
Citation 1, item 5b
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$4,048$0Aug 7, 2020Final
Citation 1, item 5c
29 CFR 1926.454(a) · Scaffold training
Serious$4,048$0Aug 7, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(a)(1)

(a) Capacity. (1) Except as provided in paragraphs (a)(2), (a)(3), (a)(4), (a)(5) and (g) of this section, each scaffold and scaffold component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it.

29 CFR 1926.451(c)(1)

(c) Criteria for supported scaffolds. (1) Supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) shall be restrained from tipping by guying, tying, bracing, or equivalent means, as follows:

29 CFR 1926.451(f)(12)

(12) Work on or from scaffolds is prohibited during storms or high winds unless a competent person has determined that it is safe for employees to be on the scaffold and those employees are protected by a personal fall arrest system or wind screens. Wind screens shall not be used unless the scaffold is secured against the anticipated wind forces imposed.

29 CFR 1926.454 · Scaffold training

Other commercial and institutional building construction employers in New Hampshire

Alert subscribers get notified of each newly cited employer in New Hampshire the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.