OSHA SearchOSHA records by employer

JB Service: OSHA inspections and violations

Tamuning, Guam · New Single-Family Housing Construction (except For-Sale Builders) · NAICS 236115

4inspections
7citation items
$4,130current penalties
Apr 11, 2015last inspection

OSHA has inspected JB Service 4 times in Guam since 2010.

The latest one began on Apr 11, 2015 on a referral, in Tamuning.

Those inspections ended with 7 citation items: 6 serious and 1 other-than-serious.

Penalties were first proposed at $5,630 and now stand at $4,130, 27% lower after settlements or reviews.

Fall protection in construction comes up most often in these citations: 2 items under 1926.501.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and JB Service averages $2,240 (1 cited inspection).

JB Service: OSHA citation items per year, 2010 to 2015
Citation items per year, by inspection date.

Want to know if OSHA cites JB Service again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 340532704 OPENED APR 11, 2015Closed

Referral · Partial · Safety · 4 employees at the site · Closed Oct 29, 2015

Across Hilton Hotel Sun Villa Building, Tamuning, GU 96931 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$2,000$1,400Oct 2, 2015Final
Citation 1, item 2
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$1,200$840Oct 2, 2015Final

Inspection 339076762 OPENED MAY 22, 2013Closed

Planned · Partial · Safety · 4 employees at the site · Closed Aug 21, 2013

Ground Floor, Takagi & Associates Building Lot 5086-1-3-1-new, Tamuning, GU 96913 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Serious$1,080$540Jul 16, 2013Final
Citation 2, item 1
29 CFR 1926.25(a) · Housekeeping
Other-than-serious$0$0Jul 16, 2013Final

Inspection 339083701 OPENED MAY 22, 2013Closed

Planned · Partial · Health · 4 employees at the site · Closed Jul 17, 2013

Ground Floor, Takagi & Associates Building Lot 5086-1-3-1-new, Tamuning, GU 96913 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 314064403 OPENED JAN 22, 2010Closed

Planned · Complete · Safety · 6 employees at the site · Closed May 18, 2016

Chin Property N. Paulino Heights, Talofofo, GU 96915 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(10) · Fall protection in construction
Serious$450$450May 6, 2010Closed
Citation 1, item 2
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
Serious$450$450May 6, 2010Closed
Citation 1, item 3
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$450$450May 6, 2010Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(1)

(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.

29 CFR 1926.25 · Housekeeping

29 CFR 1926.25(a)

(a) During the course of construction, alteration, or repairs, form and scrap lumber with protruding nails, and all other debris, shall be kept cleared from work areas, passageways, and stairs, in and around buildings or other structures.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(i)

(b) Branch circuits—(1) Ground-fault protection—(i) General. The employer shall use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. These requirements are in addition to any other requirements for equipment grounding conductors.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.701 · Concrete and Masonry Construction: general requirements

Other new single-family housing construction (except for-sale builders) employers in Guam

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.