OSHA SearchOSHA records by employer

JG Plastering LLC: OSHA inspections and violations

Longmont, Colorado · Masonry Contractors · NAICS 238140

3inspections
4citation items
$3,023current penalties
Aug 2, 2018last inspection

OSHA has inspected JG Plastering LLC 3 times in Colorado since 2014.

The latest one began on Aug 2, 2018 to follow up on an earlier case, in Longmont.

Those inspections ended with 4 citation items: 4 serious.

Penalties were first proposed at $4,383 and now stand at $3,023, 31% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 2 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and JG Plastering LLC averages $1,663 (1 cited inspection).

JG Plastering LLC: OSHA citation items per year, 2014 to 2018
Citation items per year, by inspection date.

Colorado · latest 90 days of OSHA records

134employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Colorado: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Colorado

Checking a subcontractor, a client or your own company? Watch JG Plastering LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343366571 OPENED AUG 2, 2018Closed

Follow-up · No inspection · Safety · Closed Aug 2, 2018

750 Crisman Dr, Longmont, CO 80501 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 342902103 OPENED JAN 19, 2018Closed

Complaint · Partial · Safety · 9 employees at the site · Closed Sep 12, 2018

750 Crisman Dr, Longmont, CO 80501 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$1,663$1,663Jun 5, 2018Final
Citation 1, item 1b
29 CFR 1910.1200(h)(1) · Hazard communication
Serious$0$0Jun 5, 2018Final

Inspection 339557159 OPENED JAN 17, 2014Closed

Referral · Partial · Safety · 5 employees at the site · Closed Feb 20, 2014

1906 28th St., Boulder, CO 80301 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(c)(1)(ii) · Scaffolds, general requirements
Serious$1,360$680Jan 24, 2014Final
Citation 1, item 2
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$1,360$680Jan 24, 2014Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.1200(h)(1)

(h) Employee information and training. (1) Employers shall provide employees with effective information and training on hazardous chemicals in their work area at the time of their initial assignment, and whenever a new chemical hazard the employees have not previously been trained about is introduced into their work area. Information and training may be designed to cover categories of hazards (e.g., flammability, carcinogenicity) or specific chemicals. Chemical-specific information must always be available through labels and safety data sheets.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(c)(1)(ii)

(ii) Guys, ties, and braces shall be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and be repeated vertically at locations of horizontal members every 20 feet (6.1 m) or less thereafter for scaffolds 3 feet (0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91 m) wide. The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 height from the top. Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other).

Other masonry contractors employers in Colorado

Alert subscribers get notified of each newly cited employer in Colorado the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.