Inspection 346462096 OPENED JAN 30, 2023Closed
John Weaver Parkway, Elkhart, IN 46514 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Since 2021, OSHA inspectors have visited JH Construction in Indiana 3 times.
The most recent inspection opened on Jan 30, 2023 after a complaint, in Elkhart.
In all, OSHA issued 4 citation items: 3 serious and 1 repeat.
The proposed penalties came to $4,600; today they stand at $1,789, 61% less.
The rule cited most here is 1926.453 (aerial lifts), 2 times.
Among construction employers, the typical cited inspection since 2015 ends with a $3,079 penalty. JH Construction averages $894 across 2 cited inspections.
Want to know if OSHA cites JH Construction again? Add it to a watchlist and we will email you the morning the citation shows up.
Watch this companyJohn Weaver Parkway, Elkhart, IN 46514 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
1001 W. Brooklyn St, Syracuse, IN 46567 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.95(a) · Criteria for personal protective equipment |
Serious | $800 | $400 | Oct 14, 2021 | Final |
| Citation 2, item 1 29 CFR 1926.453(b)(2)(v) · Aerial lifts |
Repeat | $3,200 | $1,000 | Oct 14, 2021 | Final |
301 Benchmark Dr, Elkhart, IN 46514 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.451(f)(7) · Scaffolds, general requirements |
Serious | $225 | $146 | May 18, 2021 | Final |
| Citation 1, item 2 29 CFR 1926.453(b)(2)(v) · Aerial lifts |
Serious | $375 | $243 | May 18, 2021 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.451(f)(7)
(7) Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Such activities shall be performed only by experienced and trained employees selected for such work by the competent person.
29 CFR 1926.453(b)(2)(v)
(v) A body belt shall be worn and a lanyard attached to the boom or basket when working from an aerial lift.
29 CFR 1926.95(a)
(a) Application. Protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation or physical contact.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.