Joaquin Gomez: OSHA inspections and violations

Braselton, Georgia · Masonry Contractors · NAICS 238140

1inspections
6citation items
$10,514current penalties
Nov 8, 2019last inspection

OSHA inspectors have visited Joaquin Gomez in Georgia one time.

It opened on Nov 8, 2019 as a planned inspection, in Braselton.

In all, OSHA issued 6 citation items: 6 serious.

The penalties, $10,514 in total, stand where OSHA first set them.

The rule cited most here is 1926.451 (scaffolds, general requirements), 5 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Joaquin Gomez averages $10,514 across 1 cited inspection.

Joaquin Gomez: OSHA citation items per year, 2019 to 2019
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

138employers cited

6 of them in the same industry

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Joaquin Gomez and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344463765 OPENED NOV 8, 2019Closed

Planned · Partial · Safety · 5 employees at the site · Closed Oct 26, 2022

2311 Sparta Way, Braselton, GA 30517 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,415$2,415Dec 2, 2019Final
Citation 1, item 1b
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$0$0Dec 2, 2019Final
Citation 1, item 2a
29 CFR 1926.451(c)(1)(i) · Scaffolds, general requirements
Serious$2,415$2,415Dec 2, 2019Final
Citation 1, item 2b
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$0$0Dec 2, 2019Final
Citation 1, item 3
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Serious$2,842$2,842Dec 2, 2019Final
Citation 1, item 4
29 CFR 1926.454(a) · Scaffold training
Serious$2,842$2,842Dec 2, 2019Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(1)(i)

(i) Guys, ties, and braces shall be installed at locations where horizontal members support both inner and outer legs.

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.454 · Scaffold training

Other masonry contractors employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.