4inspections
8citation items
$840current penalties
Dec 18, 2015last inspection

OSHA has inspected Joe Hempfling Masonry Inc 4 times in Oregon since 1984.

The latest one began on Dec 18, 2015 on a referral, in Beaverton.

Those inspections ended with 8 citation items: 7 serious and 1 other-than-serious.

Penalties were first proposed at $840 and still stand at $840.

Scaffolds, general requirements comes up most often in these citations: 2 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Joe Hempfling Masonry Inc averages $400 (1 cited inspection).

Joe Hempfling Masonry Inc: OSHA citation items per year, 1984 to 2015
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

397employers cited

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Joe Hempfling Masonry Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341132132 OPENED DEC 18, 2015Closed

Referral · Partial · Safety · 6 employees at the site · Closed Jul 21, 2016

6943 Nw 158th, Beaverton, OR 97006 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-0134(8)(A)
Serious$200$200Feb 22, 2016Final
Citation 1, item 2
29 CFR OAR 437-001-0765(13)-1
Serious$200$200Feb 22, 2016Final

Inspection 126699024 OPENED NOV 2, 1995Closed

Planned · Complete · Safety · 4 employees at the site · Closed Jul 3, 1996

12775 Sw 69th Ave, Tigard, OR 97223 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(a)(4) · Scaffolds, general requirements
Serious$100$100Dec 8, 1995Closed
Citation 1, item 2
29 CFR 1926.451(a)(13) · Scaffolds, general requirements
Serious$100$100Dec 8, 1995Closed
Citation 2, item 3
29 CFR 1926.501(b)(4)(ii) · Fall protection in construction
Serious$0$0Dec 8, 1995Closed

Inspection 123711095 OPENED NOV 5, 1992Closed

Planned · Complete · Safety · 4 employees at the site · Closed Sep 21, 2010

328 Ne 64th Ct, Hillsboro, OR 97124 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.300(b)(2) · Tools—Hand and Power: general requirements
Serious$120$120Dec 7, 1992Closed
Citation 1, item 2
29 CFR 1926.50(c) · Medical services and first aid
Serious$120$120Dec 7, 1992Closed

Inspection 15072259 OPENED JUL 18, 1984Closed

Planned · Complete · Safety · 2 employees at the site · Closed Sep 28, 1984

Corner Greenburg Rd & Hall Blvd, Ptld, OR 97223 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 7832149
Other-than-serious$0$0Aug 7, 1984Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.300 · Tools—Hand and Power: general requirements

29 CFR 1926.300(b)(2)

(2) Belts, gears, shafts, pulleys, sprockets, spindles, drums, fly wheels, chains, or other reciprocating, rotating or moving parts of equipment shall be guarded if such parts are exposed to contact by employees or otherwise create a hazard. Guarding shall meet the requirements as set forth in American National Standards Institute, B15.1-1953 (R1958), Safety Code for Mechanical Power-Transmission Apparatus.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(a)(13)

(a) Capacity. (1) Except as provided in paragraphs (a)(2), (a)(3), (a)(4), (a)(5) and (g) of this section, each scaffold and scaffold component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it.

29 CFR 1926.451(a)(4)

(4) Each suspension rope, including connecting hardware, used on adjustable suspension scaffolds shall be capable of supporting, without failure, at least 6 times the maximum intended load applied or transmitted to that rope with the scaffold operating at either the rated load of the hoist, or 2 (minimum) times the stall load of the hoist, whichever is greater.

29 CFR 1926.50 · Medical services and first aid

29 CFR 1926.501 · Fall protection in construction

Other masonry contractors employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.