OSHA SearchOSHA records by employer

Joel Rivera: OSHA inspections and violations

Willis, Texas · Masonry Contractors · NAICS 238140

5inspections
13citation items
$20,444current penalties
Aug 2, 2024last inspection

Since 2011, OSHA inspectors have visited Joel Rivera in Texas 5 times.

The most recent inspection opened on Aug 2, 2024 as a planned inspection, in Josephine.

In all, OSHA issued 13 citation items: 13 serious.

The proposed penalties came to $42,464; today they stand at $20,444, 52% less.

The rule cited most here is 1926.405 (job-site wiring), 4 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,079 penalty. Joel Rivera averages $5,722 across 2 cited inspections.

Joel Rivera: OSHA citation items per year, 2011 to 2024
Citation items per year, by inspection date.

Want to know if OSHA cites Joel Rivera again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 347662199 OPENED AUG 2, 2024Closed

Planned · Partial · Health · 9 employees at the site · Closed Dec 30, 2024

624 Banks Pl, Josephine, TX 75135 · Framing Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 347662215 OPENED AUG 2, 2024Open

Planned · Partial · Safety · 9 employees at the site · Open

624 Banks Pl, Josephine, TX 75135 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.100(a) · Hard hats in construction
Serious$2,128$2,128Jan 29, 2025Final
Citation 1, item 2
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$4,965$4,965Jan 29, 2025Final

Inspection 346449432 OPENED JAN 20, 2023Closed

Follow-up · Partial · Safety · 4 employees at the site · Closed Jan 31, 2023

611 Starlit Sky Ct., Willis, TX 77318 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 346248040 OPENED SEP 27, 2022Closed

Planned · Partial · Safety · 4 employees at the site · Closed Apr 2, 2025

611 Starlit Sky Ct., Willis, TX 77318 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,486$2,486Oct 27, 2022Final
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$1,865$1,865Oct 27, 2022Final

Inspection 315723163 OPENED AUG 9, 2011Closed

Planned · Partial · Safety · 5 employees at the site · Closed May 15, 2016

3831 Copper Creek Lane, Missouri City, TX 77459 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.404(b)(1)(iiic) · Ground-fault protection on job sites
Serious$3,000$0Nov 14, 2011Closed
Citation 1, item 2
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Serious$3,000$0Nov 14, 2011Closed
Citation 1, item 3
29 CFR 1926.405(g)(2)(iii) · Job-site wiring
Serious$3,000$0Nov 14, 2011Closed
Citation 1, item 4
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$4,200$2,400Nov 14, 2011Closed
Citation 1, item 5
29 CFR 1926.454(a) · Scaffold training
Serious$4,200$1,800Nov 14, 2011Closed
Citation 1, item 6
29 CFR 1926.454(b) · Scaffold training
Serious$4,620$1,800Nov 14, 2011Closed
Citation 1, item 7a
29 CFR 1926.404(b)(1)(iiic) · Ground-fault protection on job sites
Serious$3,000$3,000Nov 14, 2011Closed
Citation 1, item 7b
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Serious$3,000$0Nov 14, 2011Closed
Citation 1, item 7c
29 CFR 1926.405(g)(2)(iii) · Job-site wiring
Serious$3,000$0Nov 14, 2011Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(iiic)

(C) Each cord set, attachment cap, plug and receptacle of cord sets, and any equipment connected by cord and plug, except cord sets and receptacles which are fixed and not exposed to damage, shall be visually inspected before each day's use for external defects, such as deformed or missing pins or insulation damage, and for indications of possible internal damage. Equipment found damaged or defective shall not be used until repaired.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(g)(2)(iii)

(iii) Splices. Flexible cords shall be used only in continuous lengths without splice or tap. Hard service flexible cords No. 12 or larger may be repaired if spliced so that the splice retains the insulation, outer sheath properties, and usage characteristics of the cord being spliced.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.454 · Scaffold training

29 CFR 1926.501 · Fall protection in construction