Jonny Maudiel Ayala Zelaya: OSHA inspections and violations

Newnan, Georgia · Siding Contractors · NAICS 238170

1inspections
3citation items
$6,400current penalties
Dec 4, 2015last inspection

OSHA inspectors have visited Jonny Maudiel Ayala Zelaya in Georgia one time.

It opened on Dec 4, 2015 as a planned inspection, in Newnan.

In all, OSHA issued 3 citation items: 3 serious.

The penalties, $6,400 in total, stand where OSHA first set them.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Jonny Maudiel Ayala Zelaya averages $6,400 across 1 cited inspection.

Jonny Maudiel Ayala Zelaya: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

150employers cited

8 of them in the same industry

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Jonny Maudiel Ayala Zelaya and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341100543 OPENED DEC 4, 2015Closed

Planned · Partial · Safety · 4 employees at the site · Closed Oct 7, 2019

Lot 26 Canyon View Dr., Newnan, GA 30265 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Serious$1,600$1,600Feb 17, 2016Final
Citation 1, item 2
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$2,800$2,800Feb 17, 2016Final
Citation 1, item 3
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$2,000$2,000Feb 17, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(g)(1)(vii)

(vii) For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(j)(2)

(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.

Other siding contractors employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.