OSHA SearchOSHA records by employer

Jorge Cruz: OSHA inspections and violations

Southaven, Mississippi · Framing Contractors · NAICS 238130

1inspections
6citation items
$12,751current penalties
Jan 19, 2018last inspection

OSHA has inspected Jorge Cruz once in Mississippi.

The inspection began on Jan 19, 2018 after a complaint, in Southaven.

That inspection ended with 6 citation items: 6 serious.

Penalties were first proposed at $12,751 and still stand at $12,751.

Scaffold training comes up most often in these citations: 2 items under 1926.454.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Jorge Cruz averages $12,751 (1 cited inspection).

Jorge Cruz: OSHA citation items per year, 2018 to 2018
Citation items per year, by inspection date.

Mississippi · latest 90 days of OSHA records

15employers cited

Get notified the morning OSHA posts each new citation in Mississippi: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Mississippi

Checking a subcontractor, a client or your own company? Watch Jorge Cruz and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343028015 OPENED JAN 19, 2018Closed

Complaint · Complete · Safety · 1 employee at the site · Closed Mar 29, 2023

Lot 55 Long Rd., Southaven, MS 38671 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.25(a) · Housekeeping
Serious$1,663$1,663Mar 30, 2018Final
Citation 1, item 2
29 CFR 1926.451(b)(2) · Scaffolds, general requirements
Serious$2,772$2,772Mar 30, 2018Final
Citation 1, item 3
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$2,772$2,772Mar 30, 2018Final
Citation 1, item 4
29 CFR 1926.452(a)(4) · Rules for each type of scaffold
Serious$2,772$2,772Mar 30, 2018Final
Citation 1, item 5a
29 CFR 1926.454(a) · Scaffold training
Serious$2,772$2,772Mar 30, 2018Final
Citation 1, item 5b
29 CFR 1926.454(a) · Scaffold training
Serious$0$0Mar 30, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.25 · Housekeeping

29 CFR 1926.25(a)

(a) During the course of construction, alteration, or repairs, form and scrap lumber with protruding nails, and all other debris, shall be kept cleared from work areas, passageways, and stairs, in and around buildings or other structures.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(2)

(2) Except as provided in paragraphs (b)(2)(i) and (b)(2)(ii) of this section, each scaffold platform and walkway shall be at least 18 inches (46 cm) wide.

29 CFR 1926.451(g)(1)

(g) Fall protection. (1) Each employee on a scaffold more than 10 feet (3.1 m) above a lower level shall be protected from falling to that lower level. Paragraphs (g)(1) (i) through (vii) of this section establish the types of fall protection to be provided to the employees on each type of scaffold. Paragraph (g)(2) of this section addresses fall protection for scaffold erectors and dismantlers.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.454 · Scaffold training

Other framing contractors employers in Mississippi

Alert subscribers get notified of each newly cited employer in Mississippi the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.