OSHA SearchOSHA records by employer

Jose Miranda's Construction dba AM Construction: OSHA inspections and violations

Chicago, Illinois · Masonry Contractors · NAICS 238140

1inspections
7citation items
$16,450current penalties
Jan 3, 2023last inspection

OSHA has inspected Jose Miranda's Construction dba AM Construction once in Illinois.

The inspection began on Jan 3, 2023 on a referral, in Chicago.

That inspection ended with 7 citation items: 6 serious and 1 other-than-serious.

Penalties were first proposed at $16,450 and still stand at $16,450.

Scaffolds, general requirements comes up most often in these citations: 6 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Jose Miranda's Construction dba AM Construction averages $16,450 (1 cited inspection).

Jose Miranda's Construction dba AM Construction: OSHA citation items per year, 2023 to 2023
Citation items per year, by inspection date.

Illinois · latest 90 days of OSHA records

421employers cited

11 of them in the same industry

Get notified the morning OSHA posts each new citation in Illinois: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Illinois

Checking a subcontractor, a client or your own company? Watch Jose Miranda's Construction dba AM Construction and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346414170 OPENED JAN 3, 2023Closed

Referral · Partial · Safety · 2 employees at the site · Closed Mar 10, 2026

1519 W. 79th Street, Chicago, IL 60634 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(a)(6) · Scaffolds, general requirements
Serious$3,349$3,349May 10, 2023Final
Citation 1, item 1b
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$0$0May 10, 2023Final
Citation 1, item 2
29 CFR 1926.451(d)(5)(iii) · Scaffolds, general requirements
Serious$4,688$4,688May 10, 2023Final
Citation 1, item 3a
29 CFR 1926.451(d)(16) · Scaffolds, general requirements
Serious$3,349$3,349May 10, 2023Final
Citation 1, item 3b
29 CFR 1926.451(d)(17) · Scaffolds, general requirements
Serious$0$0May 10, 2023Final
Citation 1, item 4
29 CFR 1926.451(g)(1)(ii) · Scaffolds, general requirements
Serious$4,688$4,688May 10, 2023Final
Citation 2, item 1
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$376$376Jun 22, 2023Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(c)(1)

(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(a)(6)

(6) Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design. Non-mandatory appendix A to this subpart contains examples of criteria that will enable an employer to comply with paragraph (a) of this section.

29 CFR 1926.451(d)(16)

(16) In addition to the normal operating brake, suspension scaffold power-operated hoists and manually operated hoists shall have a braking device or locking pawl which engages automatically when a hoist makes either of the following uncontrolled movements: an instantaneous change in momentum or an accelerated overspeed.

Other masonry contractors employers in Illinois

Alert subscribers get notified of each newly cited employer in Illinois the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.