Inspection 342224433 OPENED APR 4, 2017Closed
211 W El Dorado Blvd, Friendswood, TX 77549 · Masonry Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Friendswood, Texas · Masonry Contractors · NAICS 238140
JR Quality Plastering has 2 OSHA inspections on record in Texas, the first in 2016.
OSHA's last visit started on Apr 4, 2017 to follow up on an earlier case, in Friendswood.
Across those inspections OSHA issued 5 citation items: 5 serious.
OSHA proposed $8,800 in penalties. After settlements and reviews the total is $2,560, down 71%.
Most often, OSHA cited 1926.451, scaffolds, general requirements (5 items).
For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. JR Quality Plastering averages $2,560 over 1 cited inspection in that time.
Texas · latest 90 days of OSHA records
391employers cited
13 of them in the same industry
Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Texas
Checking a subcontractor, a client or your own company? Watch JR Quality Plastering and get notified the morning OSHA posts a new citation for it.
Watch this company211 W El Dorado Blvd, Friendswood, TX 77549 · Masonry Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
211 W El Dorado Blvd, Friendswood, TX 77549 · Masonry Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.451(b)(1) · Scaffolds, general requirements |
Serious | $2,400 | $960 | Jun 28, 2016 | Final |
| Citation 1, item 2a 29 CFR 1926.451(c)(1)(ii) · Scaffolds, general requirements |
Serious | $2,400 | $960 | Jun 28, 2016 | Final |
| Citation 1, item 2b 29 CFR 1926.451(c)(2) · Scaffolds, general requirements |
Serious | $0 | $0 | Jun 28, 2016 | Final |
| Citation 1, item 3a 29 CFR 1926.451(e)(1) · Scaffolds, general requirements |
Serious | $1,600 | $640 | Jun 28, 2016 | Final |
| Citation 1, item 3b 29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements |
Serious | $2,400 | $0 | Jun 28, 2016 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.451(b)(1)
(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:
29 CFR 1926.451(c)(1)(ii)
(ii) Guys, ties, and braces shall be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and be repeated vertically at locations of horizontal members every 20 feet (6.1 m) or less thereafter for scaffolds 3 feet (0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91 m) wide. The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 height from the top. Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other).
29 CFR 1926.451(c)(2)
(2) Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.
Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.