OSHA SearchOSHA records by employer

Juan Daniel Castelan: OSHA inspections and violations

Huntsville, Texas · Framing Contractors · NAICS 238130

1inspections
3citation items
$2,903current penalties
Oct 30, 2024last inspection

OSHA has inspected Juan Daniel Castelan once in Texas.

The inspection began on Oct 30, 2024 as a planned inspection, in Huntsville.

That inspection ended with 3 citation items: 3 serious.

Penalties were first proposed at $4,839 and now stand at $2,903, 40% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 3 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Juan Daniel Castelan averages $2,903 (1 cited inspection).

Juan Daniel Castelan: OSHA citation items per year, 2024 to 2024
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

393employers cited

55 of them in the same industry

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch Juan Daniel Castelan and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347878183 OPENED OCT 30, 2024Closed

Planned · Partial · Safety · 4 employees at the site · Closed Mar 10, 2025

1212 Ave M, Huntsville, TX 77340 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$4,839$2,903Jan 7, 2025Final
Citation 1, item 1b
29 CFR 1926.451(c)(1)(ii) · Scaffolds, general requirements
Serious$0$0Jan 7, 2025Final
Citation 1, item 1c
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$0$0Jan 7, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(1)(ii)

(ii) Guys, ties, and braces shall be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and be repeated vertically at locations of horizontal members every 20 feet (6.1 m) or less thereafter for scaffolds 3 feet (0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91 m) wide. The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 height from the top. Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other).

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

Other framing contractors employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.