Since 2009, OSHA inspectors have visited JZ Construction Inc. in Colorado 4 times.

The most recent inspection opened on Oct 7, 2023, in Colorado Springs.

In all, OSHA issued 6 citation items: 6 serious.

The proposed penalties came to $13,592; today they stand at $9,702, 29% less.

The rule cited most here is 1926.501 (fall protection in construction), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. JZ Construction Inc. averages $2,734 across 3 cited inspections.

JZ Construction Inc.: OSHA citation items per year, 2009 to 2023
Citation items per year, by inspection date.

Colorado · latest 90 days of OSHA records

136employers cited

21 of them in the same industry

Get notified the morning OSHA posts each new citation in Colorado: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Colorado

Checking a subcontractor, a client or your own company? Watch JZ Construction Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347020398 OPENED OCT 7, 2023Closed

Programmed other · Partial · Safety · 1 employee at the site · Closed Mar 6, 2024

4018 Notch Trail, Colorado Springs, CO 80924 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.1404(h)(2) · Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations)
Serious$4,688$3,422Oct 23, 2023Final
Citation 1, item 1b
29 CFR 1926.1412(d)(1) · Inspections
Serious$0$0Oct 23, 2023Final
Citation 1, item 1c
29 CFR 1926.1427(a) · Operator training, certification, and evaluation
Serious$0$0Oct 23, 2023Final

Inspection 347020422 OPENED OCT 7, 2023Closed

Planned · Partial · Safety · 2 employees at the site · Closed Feb 20, 2024

4941 Pearl Lake Wy, Colorado Springs, CO 80924 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$4,688$3,422Oct 18, 2023Final

Inspection 342807286 OPENED DEC 1, 2017Closed

Planned · Partial · Safety · 9 employees at the site · Closed Jan 9, 2018

5475 Imola Dr, Colorado Springs, CO 80906 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$2,716$1,358Dec 13, 2017Final

Inspection 313411787 OPENED AUG 1, 2009Closed

Planned · Partial · Safety · 6 employees at the site · Closed Oct 20, 2009

160 65th St., Loveland, CO 80538 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$1,500$1,500Aug 3, 2009Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1404 · Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations)

29 CFR 1926.1404(h)(2)

(2) Blocking material. The size, amount, condition and method of stacking the blocking must be sufficient to sustain the loads and maintain stability.

29 CFR 1926.1412 · Inspections

29 CFR 1926.1412(d)(1)

(d) Each shift. (1) A competent person must begin a visual inspection prior to each shift the equipment will be used, which must be completed before or during that shift. The inspection must consist of observation for apparent deficiencies. Taking apart equipment components and booming down is not required as part of this inspection unless the results of the visual inspection or trial operation indicate that further investigation necessitating taking apart equipment components or booming down is needed. Determinations made in conducting the inspection must be reassessed in light of observations made during operation. At a minimum the inspection must include all of the following:

29 CFR 1926.1427 · Operator training, certification, and evaluation

29 CFR 1926.1427(a)

(a) General requirements for operators. The employer must ensure that each operator is trained, certified/licensed, and evaluated in accordance with this section before operating any equipment covered under subpart CC, except for the equipment listed in paragraph (a)(2) of this section.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.501 · Fall protection in construction

Other framing contractors employers in Colorado

Alert subscribers get notified of each newly cited employer in Colorado the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.