Kanto Corporation: OSHA inspections and violations
Portland, Oregon · Other Chemical and Allied Products Merchant Wholesalers · NAICS 424690
13inspections
30citation items
$7,240current penalties
Sep 4, 2019last inspection
OSHA has inspected Kanto Corporation 13 times in Oregon since 1997.
The latest one began on Sep 4, 2019 after a complaint, in Portland.
Those inspections ended with 30 citation items: 28 serious and 2 other-than-serious.
Penalties were first proposed at $11,440 and now stand at $7,240, 37% lower after settlements or reviews.
Process safety management comes up most often in these citations: 13 items under 1910.119.
How that compares: the median penalty per cited inspection for wholesale employers since 2015 is $3,425, and Kanto Corporation averages $180 (2 cited inspections).
Kanto Corporation also files yearly injury logs with OSHA, summarized below.
Citation items per year, by inspection date.
Oregon · latest 90 days of OSHA records
386employers cited
Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.
Incident on Sep 19, 2011: Employee's scalp is sprayed with ammonium fluoride
On September 19, 2011, Employee #1, a second shift production operator, was tran sferring ammonium fluoride to the buffered hydrofluoric acid storage tank. This task involved inserting a siphon into a 55-gallon drum of ammonium fluoride and activating the pump. Both the 55-gallon drum and the pump were located inside pr otective enclosures. The drum enclosure was fitted with strip curtains on the fr ont. As Employee #1 turned on the pump, he noticed an ammonium fluoride leak com ing from the hose fitting on top of the siphon. He reached into the enclosure an d attempted to tighten the fitting. This action caused the leak to increase and liquid sprayed through the open curtain. The ammonium fluoride liquid hit Employ ee #1's face shield and arm, and a small amount sprayed onto his scalp. Employee #1 alerted his supervisor about the exposure and immediately went to a shower. He showered for approximately 20 minutes. Coworkers then treated his scalp with calcium gluconate gel and called emergency medical services. Paramedics arrived, and they had Employee #1 shower for an additional 20 minutes. Employee #1 was t hen transported to the emergency room. He was treated with calcium gluconate adm inistered intravenously and hospitalized until the next morning. Employee #1 did not experience skin burns, noticeable pain, or any other symptoms, as a result of the exposure.
No citations from this inspection.
Inspection 314966367 OPENED SEP 21, 2010Closed
Monitoring · Partial · Health · 70 employees at the site · Closed Sep 21, 2010
Incident on Feb 12, 2009: Employee is injured after inhaling acid vapors
On February 12, 2009, a drum of 49HF acid was over-filled in the drum washing ro om and the acid spilled onto the floor. Employee #1 was cleaning up the spill wi thout respirator protection, and he inhaled the acid vapors. He suffered serious burns to his mouth, esophagus, and lungs, and was hospitalized for 10 days.
Incident on Jun 22, 2005: Employee's legs are burned by hydrofluoric acid
On June 22, 2005, Employee #1 was working at a facility at which chemicals were repackaged. She was cleaning out a 1,000 gallon tote that previously held 49 per cent hydrofluoric acid. She sustained chemical burns to her calves. She was hosp italized.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2024, the Portland site logged 2 recordable injuries or illnesses among about 105 workers: 2.3 per 100 full-time workers, against a median of 0.7 for its industry. Those cases cost 7 days away from work.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
Kanto Corporation
Portland · 2024
105
2
1
2.3
0.7
Included with any plan: 8 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.
(5) The employer shall establish a system to promptly address the team's findings and recommendations; assure that the recommendations are resolved in a timely manner and that the resolution is documented; document what actions are to be taken; complete actions as soon as possible; develop a written schedule of when these actions are to be completed; communicate the actions to operating, maintenance and other employees whose work assignments are in the process and who may be affected by the recommendations or actions.
29 CFR 1910.120 · Hazardous waste operations and emergency response
Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.