OSHA SearchOSHA records by employer

Kelley & Raisl Construction Inc: OSHA inspections and violations

Portland, Oregon · Framing Contractors · NAICS 238130

3inspections
12citation items
$1,030current penalties
Mar 19, 2015last inspection

Since 1991, OSHA inspectors have visited Kelley & Raisl Construction Inc in Oregon 3 times.

The most recent inspection opened on Mar 19, 2015 as a planned inspection, in Dundee.

In all, OSHA issued 12 citation items: 7 serious and 5 other-than-serious.

The penalties, $1,030 in total, stand where OSHA first set them.

The rule cited most here is 1926.451 (scaffolds, general requirements), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Kelley & Raisl Construction Inc averages $630 across 1 cited inspection.

Kelley & Raisl Construction Inc: OSHA citation items per year, 1991 to 2015
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

396employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Kelley & Raisl Construction Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340579341 OPENED MAR 19, 2015Closed

Planned · Partial · Safety · 4 employees at the site · Closed Jul 29, 2015

20155 Ne Overlook Dr, Dundee, OR 97115 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(2)
Serious$630$630Apr 13, 2015Final
Citation 2, item 2
29 CFR OAR 437-003-0404(2)
Other-than-serious$0$0Apr 13, 2015Final
Citation 2, item 3
29 CFR OAR 437-001-0765(13)-1
Other-than-serious$0$0Apr 13, 2015Final

Inspection 302042734 OPENED MAY 15, 1998Closed

Planned · Complete · Safety · 5 employees at the site · Closed Oct 20, 1999

125 Allen St, Depoe Bay, OR 97341 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$100$100Jul 27, 1998Closed
Citation 1, item 1b
29 CFR 1926.451(b)(2) · Scaffolds, general requirements
Serious$0$0Jul 27, 1998Closed
Citation 1, item 1c
29 CFR 1926.451(a)(6) · Scaffolds, general requirements
Serious$0$0Jul 27, 1998Closed
Citation 2, item 2
29 CFR 1926.404(b)(1)(ii) · Ground-fault protection on job sites
Other-than-serious$0$0Jul 27, 1998Closed
Citation 2, item 3
29 CFR 1926.50(d)(1) · Medical services and first aid
Other-than-serious$0$0Jul 27, 1998Closed

Inspection 115713786 OPENED OCT 14, 1991Closed

Planned · Complete · Safety · 2 employees at the site · Closed Dec 30, 1991

14945 Se 117th Ave, Portland, OR 97015 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.500(e)(1) · Scope, application, and definitions applicable to this subpart
Serious$150$150Oct 31, 1991Closed
Citation 1, item 2 Serious$75$75Oct 31, 1991Closed
Citation 1, item 3
29 CFR 1926.25(a) · Housekeeping
Serious$75$75Oct 31, 1991Closed
Citation 2, item 4
29 CFR 1926.50(c) · Medical services and first aid
Other-than-serious$0$0Oct 31, 1991Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.25 · Housekeeping

29 CFR 1926.25(a)

(a) During the course of construction, alteration, or repairs, form and scrap lumber with protruding nails, and all other debris, shall be kept cleared from work areas, passageways, and stairs, in and around buildings or other structures.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(ii)

(ii) Ground-fault circuit interrupters. All 120-volt, single-phase, 15- and 20-ampere receptacle outlets on construction sites, which are not a part of the permanent wiring of the building or structure and which are in use by employees, shall have approved ground-fault circuit interrupters for personnel protection. Receptacles on a two-wire, single-phase portable or vehicle-mounted generator rated not more than 5kW, where the circuit conductors of the generator are insulated from the generator frame and all other grounded surfaces, need not be protected with ground-fault circuit interrupters.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(a)(6)

(6) Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design. Non-mandatory appendix A to this subpart contains examples of criteria that will enable an employer to comply with paragraph (a) of this section.

29 CFR 1926.50 · Medical services and first aid

29 CFR 1926.500 · Scope, application, and definitions applicable to this subpart

29 CFR 7030.400

Other framing contractors employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.