Eugene, Oregon · Poured Concrete Foundation and Structure Contractors · NAICS 238110

9inspections
33citation items
$1,520current penalties
Mar 1, 2023last inspection

Kem LLC has 9 OSHA inspections on record in Oregon, the first in 2005.

OSHA's last visit started on Mar 1, 2023 after a complaint, in Eugene.

Across those inspections OSHA issued 33 citation items: 20 serious and 13 other-than-serious.

OSHA proposed $1,520 in penalties and the amount has not been reduced.

Most often, OSHA cited 1926.62, lead in construction (8 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Kem LLC averages $380 over 4 cited inspections in that time.

Kem LLC: OSHA citation items per year, 2005 to 2023
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

384employers cited

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Kem LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346540461 OPENED MAR 1, 2023Closed

Complaint · Partial · Safety · 40 employees at the site · Closed Mar 23, 2023

862 Bethel Dr, Eugene, OR 97402 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341712164 OPENED AUG 17, 2016Closed

Planned · Partial · Safety · 9 employees at the site · Closed Feb 23, 2017

1611 Virginia Ave, North Bend, OR 97459 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.652(a)(1) · Trench protection
Serious$120$120Oct 11, 2016Final

Inspection 341392496 OPENED APR 11, 2016Closed

Referral · Partial · Health · 35 employees at the site · Closed Feb 8, 2017

850 Bethel Dr, Eugene, OR 97402 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.1200(h)(3)(ii) · Hazard communication
Serious$150$150Sep 15, 2016Final
Citation 1, item 1b
29 CFR 1910.1200(h)(3)(iv) · Hazard communication
Serious$0$0Sep 15, 2016Final
Citation 1, item 2
29 CFR 1910.134(a)(2) · Respiratory protection
Serious$150$150Sep 15, 2016Final
Citation 1, item 3
29 CFR 1910.134(c)(1)(ii) · Respiratory protection
Serious$150$150Sep 15, 2016Final
Citation 1, item 4
29 CFR 1910.134(f)(2) · Respiratory protection
Serious$150$150Sep 15, 2016Final

Inspection 341375459 OPENED APR 5, 2016Closed

Planned · Partial · Safety · 3 employees at the site · Closed Apr 8, 2016

1622 Jean Ct, Eugene, OR 97402 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341372241 OPENED APR 1, 2016Closed

Planned · Complete · Safety · 35 employees at the site · Closed Sep 23, 2016

850 Bethel Dr, Eugene, OR 97402 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.215(a)(1) · Grinders and abrasive wheels
Serious$200$200Apr 29, 2016Final
Citation 1, item 1b
29 CFR 1910.215(a)(4) · Grinders and abrasive wheels
Serious$0$0Apr 29, 2016Final
Citation 1, item 1c
29 CFR 1910.215(d)(3) · Grinders and abrasive wheels
Serious$0$0Apr 29, 2016Final
Citation 1, item 2
29 CFR 1910.23(c)(1) · Guarding floor and wall openings and holes
Serious$120$120Apr 29, 2016Final
Citation 1, item 3
29 CFR 1910.24(h) · Fixed industrial stairs
Serious$120$120Apr 29, 2016Final
Citation 1, item 4
29 CFR 1910.23(d)(1)(iii) · Guarding floor and wall openings and holes
Serious$120$120Apr 29, 2016Final
Citation 1, item 5
29 CFR 1910.305(b)(2)(i) · Electrical wiring methods
Serious$120$120Apr 29, 2016Final
Citation 2, item 6
29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods
Other-than-serious$0$0Apr 29, 2016Final
Citation 2, item 7
29 CFR 1910.305(g)(1)(iv)(d) · Electrical wiring methods
Other-than-serious$0$0Apr 29, 2016Final
Citation 2, item 8
29 CFR 1910.22(d)(1) · General requirements
Other-than-serious$0$0Apr 29, 2016Final
Citation 2, item 9
29 CFR OAR 437-002-0041(8)(E)-4
Other-than-serious$0$0Apr 29, 2016Final
Citation 2, item 10
29 CFR OAR 437-002-0187(2)-2
Other-than-serious$0$0Apr 29, 2016Final

Inspection 340863232 OPENED MAY 21, 2015Closed

Planned · Partial · Health · 3 employees at the site · Closed Mar 25, 2016

5324 Ne 28th Ave, Portland, OR 97211 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.62(d)(1)(i) · Lead in construction
Serious$120$120Aug 25, 2015Final
Citation 1, item 1b
29 CFR 1926.62(d)(2)(v)(a) · Lead in construction
Serious$0$0Aug 25, 2015Final
Citation 1, item 1c
29 CFR 1926.62(d)(2)(v)(b) · Lead in construction
Serious$0$0Aug 25, 2015Final
Citation 1, item 1d
29 CFR 1926.62(d)(2)(v)(c) · Lead in construction
Serious$0$0Aug 25, 2015Final
Citation 1, item 1e
29 CFR 1926.62(d)(2)(v)(d) · Lead in construction
Serious$0$0Aug 25, 2015Final
Citation 1, item 1f
29 CFR 1926.62(d)(2)(v)(e) · Lead in construction
Serious$0$0Aug 25, 2015Final
Citation 1, item 1g
29 CFR 1926.62(d)(2)(v)(f) · Lead in construction
Serious$0$0Aug 25, 2015Final
Citation 2, item 2
29 CFR 1926.62(e)(2)(i) · Lead in construction
Other-than-serious$0$0Aug 25, 2015Final

Inspection 312837040 OPENED DEC 2, 2008Closed

Planned · Partial · Safety · 16 employees at the site · Closed Mar 26, 2010

Scappoose Community Park Sw Jp West Rd, Scappoose, OR 97056 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.150(c)(1)(viii) · Fire protection
Other-than-serious$0$0Dec 17, 2008Closed
Citation 1, item 2
29 CFR 1926.59(g)(8) · Hazard communication
Other-than-serious$0$0Dec 17, 2008Closed

Inspection 312304843 OPENED NOV 5, 2008Closed

Planned · Complete · Safety · 16 employees at the site · Closed May 1, 2009

19450 Sw Cipole Rd Ste 107, Tualatin, OR 97062 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Other-than-serious$0$0Dec 17, 2008Closed
Citation 1, item 2
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Other-than-serious$0$0Dec 17, 2008Closed
1 older inspection

Inspection 309280105 OPENED DEC 5, 2005Closed

Planned · Complete · Safety · 15 employees at the site · Closed Jun 8, 2006

19405 Sw Cipole Rd #107, Tualatin, OR 97062 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.22(d)(1) · General requirements
Other-than-serious$0$0Jan 20, 2006Closed
Citation 1, item 2
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Other-than-serious$0$0Jan 20, 2006Closed
Citation 1, item 3 Other-than-serious$0$0Jan 20, 2006Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(h)(3)(ii)

(ii) The physical, health, simple asphyxiation, combustible dust, and pyrophoric gas hazards, as well as hazards not otherwise classified, of the chemicals in the work area;

29 CFR 1910.1200(h)(3)(iv)

(iv) The details of the hazard communication program developed by the employer, including an explanation of the labels received on shipped containers and the workplace labeling system used by their employer; the safety data sheet, including the order of information and how employees can obtain and use the appropriate hazard information.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(a)(2)

(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.22 · General requirements

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.24 · Fixed industrial stairs

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1926.150 · Fire protection

29 CFR 1926.59 · Hazard communication

29 CFR 1926.62 · Lead in construction

29 CFR 1926.652 · Trench protection

29 CFR 7010.7650

29 CFR 7030.5030

Other poured concrete foundation and structure contractors employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.