Inspection 346540461 OPENED MAR 1, 2023Closed
862 Bethel Dr, Eugene, OR 97402 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Kem LLC has 9 OSHA inspections on record in Oregon, the first in 2005.
OSHA's last visit started on Mar 1, 2023 after a complaint, in Eugene.
Across those inspections OSHA issued 33 citation items: 20 serious and 13 other-than-serious.
OSHA proposed $1,520 in penalties and the amount has not been reduced.
Most often, OSHA cited 1926.62, lead in construction (8 items).
For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Kem LLC averages $380 over 4 cited inspections in that time.
Oregon · latest 90 days of OSHA records
384employers cited
Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Oregon
Checking a subcontractor, a client or your own company? Watch Kem LLC and get notified the morning OSHA posts a new citation for it.
Watch this company862 Bethel Dr, Eugene, OR 97402 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
1611 Virginia Ave, North Bend, OR 97459 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.652(a)(1) · Trench protection |
Serious | $120 | $120 | Oct 11, 2016 | Final |
850 Bethel Dr, Eugene, OR 97402 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.1200(h)(3)(ii) · Hazard communication |
Serious | $150 | $150 | Sep 15, 2016 | Final |
| Citation 1, item 1b 29 CFR 1910.1200(h)(3)(iv) · Hazard communication |
Serious | $0 | $0 | Sep 15, 2016 | Final |
| Citation 1, item 2 29 CFR 1910.134(a)(2) · Respiratory protection |
Serious | $150 | $150 | Sep 15, 2016 | Final |
| Citation 1, item 3 29 CFR 1910.134(c)(1)(ii) · Respiratory protection |
Serious | $150 | $150 | Sep 15, 2016 | Final |
| Citation 1, item 4 29 CFR 1910.134(f)(2) · Respiratory protection |
Serious | $150 | $150 | Sep 15, 2016 | Final |
1622 Jean Ct, Eugene, OR 97402 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
850 Bethel Dr, Eugene, OR 97402 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.215(a)(1) · Grinders and abrasive wheels |
Serious | $200 | $200 | Apr 29, 2016 | Final |
| Citation 1, item 1b 29 CFR 1910.215(a)(4) · Grinders and abrasive wheels |
Serious | $0 | $0 | Apr 29, 2016 | Final |
| Citation 1, item 1c 29 CFR 1910.215(d)(3) · Grinders and abrasive wheels |
Serious | $0 | $0 | Apr 29, 2016 | Final |
| Citation 1, item 2 29 CFR 1910.23(c)(1) · Guarding floor and wall openings and holes |
Serious | $120 | $120 | Apr 29, 2016 | Final |
| Citation 1, item 3 29 CFR 1910.24(h) · Fixed industrial stairs |
Serious | $120 | $120 | Apr 29, 2016 | Final |
| Citation 1, item 4 29 CFR 1910.23(d)(1)(iii) · Guarding floor and wall openings and holes |
Serious | $120 | $120 | Apr 29, 2016 | Final |
| Citation 1, item 5 29 CFR 1910.305(b)(2)(i) · Electrical wiring methods |
Serious | $120 | $120 | Apr 29, 2016 | Final |
| Citation 2, item 6 29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Apr 29, 2016 | Final |
| Citation 2, item 7 29 CFR 1910.305(g)(1)(iv)(d) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Apr 29, 2016 | Final |
| Citation 2, item 8 29 CFR 1910.22(d)(1) · General requirements |
Other-than-serious | $0 | $0 | Apr 29, 2016 | Final |
| Citation 2, item 9 29 CFR OAR 437-002-0041(8)(E)-4 |
Other-than-serious | $0 | $0 | Apr 29, 2016 | Final |
| Citation 2, item 10 29 CFR OAR 437-002-0187(2)-2 |
Other-than-serious | $0 | $0 | Apr 29, 2016 | Final |
5324 Ne 28th Ave, Portland, OR 97211 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.62(d)(1)(i) · Lead in construction |
Serious | $120 | $120 | Aug 25, 2015 | Final |
| Citation 1, item 1b 29 CFR 1926.62(d)(2)(v)(a) · Lead in construction |
Serious | $0 | $0 | Aug 25, 2015 | Final |
| Citation 1, item 1c 29 CFR 1926.62(d)(2)(v)(b) · Lead in construction |
Serious | $0 | $0 | Aug 25, 2015 | Final |
| Citation 1, item 1d 29 CFR 1926.62(d)(2)(v)(c) · Lead in construction |
Serious | $0 | $0 | Aug 25, 2015 | Final |
| Citation 1, item 1e 29 CFR 1926.62(d)(2)(v)(d) · Lead in construction |
Serious | $0 | $0 | Aug 25, 2015 | Final |
| Citation 1, item 1f 29 CFR 1926.62(d)(2)(v)(e) · Lead in construction |
Serious | $0 | $0 | Aug 25, 2015 | Final |
| Citation 1, item 1g 29 CFR 1926.62(d)(2)(v)(f) · Lead in construction |
Serious | $0 | $0 | Aug 25, 2015 | Final |
| Citation 2, item 2 29 CFR 1926.62(e)(2)(i) · Lead in construction |
Other-than-serious | $0 | $0 | Aug 25, 2015 | Final |
Scappoose Community Park Sw Jp West Rd, Scappoose, OR 97056 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.150(c)(1)(viii) · Fire protection |
Other-than-serious | $0 | $0 | Dec 17, 2008 | Closed |
| Citation 1, item 2 29 CFR 1926.59(g)(8) · Hazard communication |
Other-than-serious | $0 | $0 | Dec 17, 2008 | Closed |
19450 Sw Cipole Rd Ste 107, Tualatin, OR 97062 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 | Other-than-serious | $0 | $0 | Dec 17, 2008 | Closed |
| Citation 1, item 2 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Dec 17, 2008 | Closed |
19405 Sw Cipole Rd #107, Tualatin, OR 97062 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.22(d)(1) · General requirements |
Other-than-serious | $0 | $0 | Jan 20, 2006 | Closed |
| Citation 1, item 2 29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Jan 20, 2006 | Closed |
| Citation 1, item 3 | Other-than-serious | $0 | $0 | Jan 20, 2006 | Closed |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.1200(h)(3)(ii)
(ii) The physical, health, simple asphyxiation, combustible dust, and pyrophoric gas hazards, as well as hazards not otherwise classified, of the chemicals in the work area;
29 CFR 1910.1200(h)(3)(iv)
(iv) The details of the hazard communication program developed by the employer, including an explanation of the labels received on shipped containers and the workplace labeling system used by their employer; the safety data sheet, including the order of information and how employees can obtain and use the appropriate hazard information.
29 CFR 1910.134(a)(2)
(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.
Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.