OSHA SearchOSHA records by employer

Larco Development, Inc.: OSHA inspections and violations

San Diego, California · Commercial and Institutional Building Construction · NAICS 236220

3inspections
5citation items
$4,537current penalties
May 22, 2018last inspection

OSHA has inspected Larco Development, Inc. 3 times in California since 2015.

The latest one began on May 22, 2018 as a planned inspection, in San Diego.

Those inspections ended with 5 citation items: 3 serious and 2 other-than-serious.

Penalties were first proposed at $6,481 and now stand at $4,537, 30% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 3 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Larco Development, Inc. averages $4,537 (1 cited inspection).

Larco Development, Inc.: OSHA citation items per year, 2015 to 2018
Citation items per year, by inspection date.

California · latest 90 days of OSHA records

1,139employers cited

43 of them in the same industry

Get notified the morning OSHA posts each new citation in California: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in California

Checking a subcontractor, a client or your own company? Watch Larco Development, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343174983 OPENED MAY 22, 2018Closed

Planned · Partial · Safety · 7 employees at the site · Closed Jun 13, 2018

Building 116 Cummings Road Naval Base San Diego, San Diego, CA 92136 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(g)(4)(ii) · Scaffolds, general requirements
Serious$2,523$1,766May 25, 2018Final
Citation 1, item 1b
29 CFR 1926.451(g)(4)(iv) · Scaffolds, general requirements
Serious$0$0May 25, 2018Final
Citation 1, item 2
29 CFR 1926.451(h)(2)(i) · Scaffolds, general requirements
Serious$3,958$2,771May 25, 2018Final
Citation 2, item 1
29 CFR 1910.1200(g)(8) · Hazard communication
Other-than-serious$0$0May 25, 2018Final
Citation 2, item 2
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Other-than-serious$0$0May 25, 2018Final

Inspection 341277978 OPENED FEB 24, 2016Closed

Planned · Complete · Safety · 5 employees at the site · Closed Feb 24, 2016

Bldg 8475 Mcas Miramar, San Diego, CA 92145 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 340856244 OPENED AUG 18, 2015Closed

Planned · Partial · Safety · 30 employees at the site · Closed Aug 18, 2015

Repair Sewer Line At Building 172 Marine Corps Recruit Depot, San Diego, CA 92121 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(g)(8)

(8) The employer shall maintain in the workplace copies of the required safety data sheets for each hazardous chemical, and shall ensure that they are readily accessible during each work shift to employees when they are in their work area(s). (Electronic access and other alternatives to maintaining paper copies of the safety data sheets are permitted as long as no barriers to immediate employee access in each workplace are created by such options.)

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(g)(4)(ii)

(ii) The top edge height of toprails or equivalent member on supported scaffolds manufactured or placed in service after January 1, 2000 shall be installed between 38 inches (0.97 m) and 45 inches (1.2 m) above the platform surface. The top edge height on supported scaffolds manufactured and placed in service before January 1, 2000, and on all suspended scaffolds where both a guardrail and a personal fall arrest system are required shall be between 36 inches (0.9 m) and 45 inches (1.2 m). When conditions warrant, the height of the top edge may exceed the 45-inch height, provided the guardrail system meets all other criteria of paragraph (g)(4).

Other commercial and institutional building construction employers in California

Alert subscribers get notified of each newly cited employer in California the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.