OSHA SearchOSHA records by employer

Laurus Contracting Inc: OSHA inspections and violations

Warren, Oregon · New Single-Family Housing Construction (except For-Sale Builders) · NAICS 236115

1inspections
2citation items
$120current penalties
Jul 28, 2017last inspection

OSHA has inspected Laurus Contracting Inc once in Oregon.

The inspection began on Jul 28, 2017 as a planned inspection, in Warren.

That inspection ended with 2 citation items: 1 serious and 1 other-than-serious.

Penalties were first proposed at $120 and still stand at $120.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Laurus Contracting Inc averages $120 (1 cited inspection).

Laurus Contracting Inc: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Want to know if OSHA cites Laurus Contracting Inc again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 342510500 OPENED JUL 28, 2017Closed

Planned · Complete · Safety · 2 employees at the site · Closed Jan 2, 2019

33720 Fairway Ln, Warren, OR 97053 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.304(i)(1) · Woodworking tools
Serious$120$120Dec 15, 2017Final
Citation 2, item 2
29 CFR OAR 437-001-0765(13)-1
Other-than-serious$0$0Dec 15, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.304 · Woodworking tools

29 CFR 1926.304(i)(1)

(i) Hand-fed ripsaws. (1) Each circular hand-fed ripsaw shall be guarded by a hood which shall completely enclose that portion of the saw above the table and that portion of the saw above the material being cut. The hood and mounting shall be arranged so that the hood will automatically adjust itself to the thickness of and remain in contact with the material being cut but it shall not offer any considerable resistance to insertion of material to saw or to passage of the material being sawed. The hood shall be made of adequate strength to resist blows and strains incidental to reasonable operation, adjusting, and handling, and shall be so designed as to protect the operator from flying splinters and broken saw teeth. It shall be made of material that is soft enough so that it will be unlikely to cause tooth breakage. The hood shall be so mounted as to insure that its operation will be po

Other new single-family housing construction (except for-sale builders) employers in Oregon

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.