OSHA SearchOSHA records by employer

LM Construction, Inc: OSHA inspections and violations

Finksburg, Maryland · Masonry Contractors · NAICS 238140

1inspections
6citation items
$940current penalties
Oct 12, 2016last inspection

OSHA has inspected LM Construction, Inc once in Maryland.

The inspection began on Oct 12, 2016 as a planned inspection, in Finksburg.

That inspection ended with 6 citation items: 6 serious.

Penalties were first proposed at $1,800 and now stand at $940, 48% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 3 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and LM Construction, Inc averages $940 (1 cited inspection).

LM Construction, Inc: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

Maryland · latest 90 days of OSHA records

197employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Maryland: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Maryland

Checking a subcontractor, a client or your own company? Watch LM Construction, Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341832533 OPENED OCT 12, 2016Closed

Planned · Complete · Safety · 8 employees at the site · Closed Jan 31, 2017

Lot 14 Ryans Landing Rd, Finksburg, MD 21048 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.1200(g)(1) · Hazard communication
Serious$525$284Jan 5, 2017Final
Citation 1, item 2
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Serious$375$169Jan 5, 2017Final
Citation 1, item 3
29 CFR 1926.300(b)(3) · Tools—Hand and Power: general requirements
Serious$450$203Jan 5, 2017Final
Citation 1, item 4a
29 CFR 1926.451(b)(2)(ii) · Scaffolds, general requirements
Serious$450$284Jan 5, 2017Final
Citation 1, item 4b
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$0$0Jan 5, 2017Final
Citation 1, item 4d
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$0$0Jan 5, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(g)(1)

(g) Safety data sheets. (1) Chemical manufacturers and importers shall obtain or develop a safety data sheet for each hazardous chemical they produce or import. Employers shall have a safety data sheet in the workplace for each hazardous chemical which they use.

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.300 · Tools—Hand and Power: general requirements

29 CFR 1926.300(b)(3)

(3) Types of guarding. One or more methods of machine guarding shall be provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks. Examples of guarding methods are—barrier guards, two-hand tripping devices, electronic safety devices, etc.

29 CFR 1926.451 · Scaffolds, general requirements

Other masonry contractors employers in Maryland

Alert subscribers get notified of each newly cited employer in Maryland the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.