OSHA SearchOSHA records by employer

Luis Ortega: OSHA inspections and violations

Braselton, Georgia · Masonry Contractors · NAICS 238140

1inspections
3citation items
$4,086current penalties
Aug 13, 2025last inspection

OSHA inspectors have visited Luis Ortega in Georgia one time.

It opened on Aug 13, 2025 as a planned inspection, in Braselton and is still open.

In all, OSHA issued 3 citation items: 3 serious.

The proposed penalties came to $6,810; today they stand at $4,086, 40% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Luis Ortega averages $4,086 across 1 cited inspection.

Luis Ortega: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

136employers cited

6 of them in the same industry

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Luis Ortega and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348436783 OPENED AUG 13, 2025Open

Planned · Partial · Safety · 6 employees at the site · Open

2715 Old Winder Hwy, Braselton, GA 30517 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,270$1,362Sep 5, 2025Final
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$2,270$1,362Sep 5, 2025Final
Citation 1, item 3
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$2,270$1,362Sep 5, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.451(g)(1)(vii)

(vii) For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.

Other masonry contractors employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.