Inspection 347689432 OPENED AUG 14, 2024Closed
5880 W 91st Ave, Westminster, CO 80031 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Since 2015, OSHA inspectors have visited M&B Construction Services, Inc. in Colorado 3 times.
The most recent inspection opened on Aug 14, 2024 as a planned inspection, in Westminster.
In all, OSHA issued 3 citation items: 3 serious.
The penalties, $3,600 in total, stand where OSHA first set them.
The rule cited most here is 1926.451 (scaffolds, general requirements), 2 times.
Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. M&B Construction Services, Inc. averages $3,600 across 1 cited inspection.
It reported 1 severe injury to OSHA since 2015.
Colorado · latest 90 days of OSHA records
136employers cited
3 of them in the same industry
Get notified the morning OSHA posts each new citation in Colorado: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Colorado
Checking a subcontractor, a client or your own company? Watch M&B Construction Services, Inc. and get notified the morning OSHA posts a new citation for it.
Watch this company5880 W 91st Ave, Westminster, CO 80031 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
3200 Pecos St, Denver, CO · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
3200 Pecos St, Denver, CO 80211 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.501(b)(1) · Fall protection in construction |
Serious | $1,600 | $1,600 | Sep 24, 2015 | Final |
| Citation 1, item 2a 29 CFR 1926.451(b)(1) · Scaffolds, general requirements |
Serious | $2,000 | $2,000 | Sep 24, 2015 | Final |
| Citation 1, item 2b 29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements |
Serious | $0 | $0 | Sep 24, 2015 | Final |
Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.
Jun 6, 2018, Denver: Hospitalization · cuts, lacerations · arm(s), unspecified
An employee was setting a meter in the meter bank. The box slipped and the raw edge lacerated the inside of his right arm. The laceration required surgery.
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.451(b)(1)
(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:
29 CFR 1926.451(g)(4)(i)
(i) Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.
29 CFR 1926.501(b)(1)
(b)(1) Unprotected sides and edges. Each employee on a walking/working surface (horizontal and vertical surface) with an unprotected side or edge which is 6 feet (1.8 m) or more above a lower level shall be protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems.
Alert subscribers get notified of each newly cited employer in Colorado the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.