OSHA SearchOSHA records by employer

Manchester-Water Warehouse: OSHA inspections and violations

Manchester, Tennessee · Water Supply and Irrigation Systems · NAICS 221310

2inspections
15citation items
$0current penalties
Jun 17, 2020last inspection

OSHA has inspected Manchester-Water Warehouse 2 times in Tennessee since 2015.

The latest one began on Jun 17, 2020 as a planned inspection, in Manchester.

Those inspections ended with 15 citation items: 15 serious.

None of the citations carried a penalty.

Exit routes comes up most often in these citations: 2 items under 1910.37.

How that compares: the median penalty per cited inspection for utility employers since 2015 is $0, and Manchester-Water Warehouse averages $0 (2 cited inspections).

Manchester-Water Warehouse: OSHA citation items per year, 2015 to 2020
Citation items per year, by inspection date.

Tennessee · latest 90 days of OSHA records

323employers cited

15 of them in the same industry

Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Tennessee

Checking a subcontractor, a client or your own company? Watch Manchester-Water Warehouse and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344796875 OPENED JUN 17, 2020Closed

Planned · Complete · Safety · Local government · 25 employees at the site · Closed Aug 17, 2020

736 West High Street, Manchester, TN 37355 · Water Supply and Irrigation Systems · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.28(b)(1)(i)(a) · Fall protection in general industry
Serious$0$0Jul 6, 2020Final
Citation 1, item 2
29 CFR 1910.28(b)(3)(ii) · Fall protection in general industry
Serious$0$0Jul 6, 2020Final
Citation 1, item 3
29 CFR 1910.37(a)(3) · Exit routes
Serious$0$0Jul 6, 2020Final
Citation 1, item 4
29 CFR 1910.37(b)(2) · Exit routes
Serious$0$0Jul 6, 2020Final
Citation 1, item 5
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$0$0Jul 6, 2020Final
Citation 1, item 6
29 CFR 1910.147(d)(4)(i) · Lockout/tagout
Serious$0$0Jul 6, 2020Final
Citation 1, item 7
29 CFR 1910.157(c)(1) · Portable fire extinguishers
Serious$0$0Jul 6, 2020Final
Citation 1, item 8
29 CFR 1910.157(e)(2) · Portable fire extinguishers
Serious$0$0Jul 6, 2020Final
Citation 1, item 9
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$0$0Jul 6, 2020Final
Citation 1, item 10
29 CFR 1910.303(g)(1)(ii) · Electrical equipment, general requirements
Serious$0$0Jul 6, 2020Final
Citation 1, item 11
29 CFR 1910.305(b)(2)(i) · Electrical wiring methods
Serious$0$0Jul 6, 2020Final
Citation 1, item 12
29 CFR 1910.1030(c)(1)(iv) · Bloodborne pathogens
Serious$0$0Jul 6, 2020Final
Citation 1, item 13
29 CFR TDLWD RULE 800-01-09-.06(2)
Serious$0$0Jul 6, 2020Final

Inspection 340191220 OPENED JAN 16, 2015Closed

Planned · Complete · Safety · Local government · 15 employees at the site · Closed Mar 6, 2015

736 West High Street, Manchester, TN 37355 · Water Supply and Irrigation Systems · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.303(f)(2) · Electrical equipment, general requirements
Serious$0$0Feb 2, 2015Final
Citation 1, item 2
29 CFR 1910.304(f)(1)(iv) · Grounding and circuit protection
Serious$0$0Feb 2, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1030 · Bloodborne pathogens

29 CFR 1910.1030(c)(1)(iv)

(iv) The Exposure Control Plan shall be reviewed and updated at least annually and whenever necessary to reflect new or modified tasks and procedures which affect occupational exposure and to reflect new or revised employee positions with occupational exposure. The review and update of such plans shall also:

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(6)(i)

(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.

29 CFR 1910.147(d)(4)(i)

(4) Lockout or tagout device application. (i) Lockout or tagout devices shall be affixed to each energy isolating device by authorized employees.

29 CFR 1910.157 · Portable fire extinguishers

29 CFR 1910.212 · Machine guarding

29 CFR 1910.28 · Fall protection in general industry

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.37 · Exit routes

Other water supply and irrigation systems employers in Tennessee

Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.