OSHA SearchOSHA records by employer

Maraly Construction Company, Inc.: OSHA inspections and violations

Washington, District of Columbia · Wood Kitchen Cabinet and Countertop Manufacturing · NAICS 337110

1inspections
3citation items
$1,585current penalties
Jan 20, 2022last inspection

Maraly Construction Company, Inc. has one OSHA inspection on record in District of Columbia.

OSHA opened it on Jan 20, 2022, in Washington.

From that inspection OSHA issued 3 citation items: 3 serious.

OSHA proposed $1,585 in penalties and the amount has not been reduced.

Most often, OSHA cited 1926.403, electrical equipment on job sites (2 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Maraly Construction Company, Inc. averages $1,585 over 1 cited inspection in that time.

Maraly Construction Company, Inc.: OSHA citation items per year, 2022 to 2022
Citation items per year, by inspection date.

District of Columbia · latest 90 days of OSHA records

13employers cited

Get notified the morning OSHA posts each new citation in District of Columbia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in District of Columbia

Checking a subcontractor, a client or your own company? Watch Maraly Construction Company, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345750665 OPENED JAN 20, 2022Closed

Unprogrammed other · Complete · Safety · 7 employees at the site · Closed Jan 11, 2023

1201 New York Ave., Nw, Washington, DC 20005 · Wood Kitchen Cabinet and Countertop Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.403(d)(1) · Electrical equipment on job sites
Serious$1,585$1,585Jul 20, 2022Final
Citation 1, item 1b
29 CFR 1926.403(i)(2)(i) · Electrical equipment on job sites
Serious$0$0Jul 20, 2022Final
Citation 1, item 1c
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Serious$0$0Jul 20, 2022Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(d)(1)

(d) Mounting and cooling of equipment—(1) Mounting. Electric equipment shall be firmly secured to the surface on which it is mounted. Wooden plugs driven into holes in masonry, concrete, plaster, or similar materials shall not be used.

29 CFR 1926.403(i)(2)(i)

(2) Guarding of live parts. (i) Except as required or permitted elsewhere in this subpart, live parts of electric equipment operating at 50 volts or more shall be guarded against accidental contact by cabinets or other forms of enclosures, or by any of the following means:

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(g)(2)(iv)

(iv) Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.

Other wood kitchen cabinet and countertop manufacturing employers in District of Columbia

Alert subscribers get notified of each newly cited employer in District of Columbia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.