Martin Abarca: OSHA inspections and violations

Winston Salem, North Carolina · Siding Contractors · NAICS 238170

1inspections
5citation items
$1,950current penalties
Mar 10, 2016last inspection

OSHA inspectors have visited Martin Abarca in North Carolina one time.

It opened on Mar 10, 2016, in Winston Salem.

In all, OSHA issued 5 citation items: 4 serious and 1 other-than-serious.

The proposed penalties came to $3,000; today they stand at $1,950, 35% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Martin Abarca averages $1,950 across 1 cited inspection.

Martin Abarca: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

North Carolina · latest 90 days of OSHA records

234employers cited

14 of them in the same industry

Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in North Carolina

Checking a subcontractor, a client or your own company? Watch Martin Abarca and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341315588 OPENED MAR 10, 2016Closed

Unprogrammed other · Complete · Safety · 2 employees at the site · Closed Apr 8, 2016

4077 Parkside Meadow Court, Lot# 13, Winston Salem, NC 27127 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(5)(ii) · Scaffolds, general requirements
Serious$1,500$1,000Mar 24, 2016Final
Citation 1, item 1b
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$0$0Mar 24, 2016Final
Citation 1, item 2a
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$1,500$950Mar 24, 2016Final
Citation 1, item 2b
29 CFR 1926.503(b)(1) · Fall protection training in construction
Serious$0$0Mar 24, 2016Final
Citation 2, item 1
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Other-than-serious$0$0Mar 24, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(g)(2)(iv)

(iv) Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(5)(ii)

(ii) Each platform greater than 10 feet in length shall not extend over its support more than 18 inches (46 cm), unless it is designed and installed so that the cantilevered portion of the platform is able to support employees without tipping, or has guardrails which block employee access to the cantilevered end.

29 CFR 1926.451(g)(4)(i)

(i) Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.503 · Fall protection training in construction

Other siding contractors employers in North Carolina

Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.