OSHA SearchOSHA records by employer

Master Craft Stucco, Inc.: OSHA inspections and violations

Snellville, Georgia · All Other Specialty Trade Contractors · NAICS 238990

6inspections
20citation items
$11,275current penalties
Apr 19, 2024last inspection

OSHA has inspected Master Craft Stucco, Inc. 6 times in Georgia since 2004.

The latest one began on Apr 19, 2024 after a complaint, in Atlanta.

Those inspections ended with 20 citation items: 20 serious.

Penalties were first proposed at $13,900 and now stand at $11,275, 19% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 16 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Master Craft Stucco, Inc. averages $0 (1 cited inspection).

Master Craft Stucco, Inc.: OSHA citation items per year, 2004 to 2024
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

147employers cited

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Master Craft Stucco, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347425340 OPENED APR 19, 2024Closed

Complaint · Complete · Safety · 2 employees at the site · Closed Oct 17, 2024

747 Ralph Mcgill Blvd Ne, Atlanta, GA 30312 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$0$0Sep 19, 2024Final
Citation 1, item 2
29 CFR 1926.451(c)(1) · Scaffolds, general requirements
Serious$0$0Sep 19, 2024Final
Citation 1, item 3
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$0$0Sep 19, 2024Final
Citation 1, item 4
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$0$0Sep 19, 2024Final
Citation 1, item 5
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$0$0Sep 19, 2024Final

Inspection 310954037 OPENED JUN 11, 2007Closed

Unprogrammed other · Partial · Safety · 4 employees at the site · Closed Sep 21, 2007

400 North Main Street, Alpharetta, GA 30004 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(2) · Scaffolds, general requirements
Serious$1,500$1,125Aug 15, 2007Closed
Citation 1, item 2
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$1,500$1,125Aug 15, 2007Closed
Citation 1, item 3
29 CFR 1926.452(c)(2) · Rules for each type of scaffold
Serious$1,500$1,125Aug 15, 2007Closed

Inspection 309260784 OPENED FEB 2, 2007Closed

Planned · Partial · Safety · 2 employees at the site · Closed Feb 2, 2007

3741 Tramore Parkway, Powder Springs, GA 30106 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 309621696 OPENED DEC 7, 2006Closed

Planned · Complete · Safety · 15 employees at the site · Closed Dec 5, 2007

3455 Peachtree Parkway, Suwanee, GA 30028 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$800$800Mar 12, 2007Closed
Citation 1, item 1b
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$0$0Mar 12, 2007Closed
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$800$800Mar 12, 2007Closed
Citation 1, item 3
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$1,000$1,000Mar 12, 2007Closed
Citation 1, item 4
29 CFR 1926.452(c)(2) · Rules for each type of scaffold
Serious$800$800Mar 12, 2007Closed
Citation 1, item 5
29 CFR 1926.454(a) · Scaffold training
Serious$2,000$2,000Mar 12, 2007Closed

Inspection 309615318 OPENED FEB 15, 2006Closed

Planned · Complete · Safety · 15 employees at the site · Closed Jul 19, 2006

4790 Peachtree Industrial Blvd, Norcross, GA 30071 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.453(b)(2)(v) · Aerial lifts
Serious$1,000$1,000May 23, 2006Closed

Inspection 307833426 OPENED MAY 28, 2004Closed

Planned · Partial · Safety · 2 employees at the site · Closed Nov 3, 2004

Hwy 78, Snellville, GA 30078 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(c)(3) · Scaffolds, general requirements
Serious$1,500$750Oct 13, 2004Closed
Citation 1, item 1b
29 CFR 1926.451(a)(1) · Scaffolds, general requirements
Serious$0$0Oct 13, 2004Closed
Citation 1, item 1c
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$0$0Oct 13, 2004Closed
Citation 1, item 1d
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$0$0Oct 13, 2004Closed
Citation 1, item 2
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$1,500$750Oct 13, 2004Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(a)(1)

(a) Capacity. (1) Except as provided in paragraphs (a)(2), (a)(3), (a)(4), (a)(5) and (g) of this section, each scaffold and scaffold component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it.

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(b)(1)(i)

(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.453 · Aerial lifts

29 CFR 1926.454 · Scaffold training

Other all other specialty trade contractors employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.