OSHA SearchOSHA records by employer

Maximo Rodriguez: OSHA inspections and violations

Cockeysville, Maryland · Siding Contractors · NAICS 238170

1inspections
2citation items
$1,080current penalties
Dec 8, 2015last inspection

OSHA has inspected Maximo Rodriguez once in Maryland.

The inspection began on Dec 8, 2015 as a planned inspection, in Cockeysville.

That inspection ended with 2 citation items: 2 serious.

Penalties were first proposed at $1,800 and now stand at $1,080, 40% lower after settlements or reviews.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,078, and Maximo Rodriguez averages $1,080 (1 cited inspection).

Maximo Rodriguez: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Want to know if OSHA cites Maximo Rodriguez again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 341109239 OPENED DEC 8, 2015Closed

Planned · Complete · Safety · 3 employees at the site · Closed Jun 1, 2016

10527 Willow Vista Way, Cockeysville, MD 21030 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$900$540Feb 18, 2016Final
Citation 1, item 2
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$900$540Feb 18, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(g)(1)(vii)

(vii) For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(j)(2)

(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.

Other siding contractors employers in Maryland

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.