OSHA SearchOSHA records by employer

McGuire & Hester: OSHA inspections and violations

San Francisco, California · Highway, Street, and Bridge Construction · NAICS 237310

32inspections
14citation items
$17,925current penalties
Jan 23, 2026last inspection

OSHA has inspected McGuire & Hester 32 times in California since 1973.

The latest one began on Jan 23, 2026 as a planned inspection, in Chico.

Those inspections ended with 14 citation items: 2 serious and 12 other-than-serious.

Penalties were first proposed at $21,225 and now stand at $17,925, 16% lower after settlements or reviews.

Accident prevention signs and tags comes up most often in these citations: 2 items under 1926.200.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and McGuire & Hester averages $3,213 (5 cited inspections).

McGuire & Hester also files yearly injury logs with OSHA, summarized below.

McGuire & Hester: OSHA citation items per year, 1973 to 2026
Citation items per year, by inspection date.

California · latest 90 days of OSHA records

1,130employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in California: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in California

Checking a subcontractor, a client or your own company? Watch McGuire & Hester and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348705922 OPENED JAN 23, 2026Closed

Planned · Partial · Safety · 100 employees at the site · Closed Jul 20, 2026

1050 Fremont Street, Chico, CA 95928 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 348643321 OPENED DEC 15, 2025Closed

Unprogrammed related · Partial · Safety · 10 employees at the site · Closed May 14, 2026

285 12th Street, Oakland, CA 94607 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 346782824 OPENED JUN 21, 2023Closed

Complaint · Partial · Safety · 7 employees at the site · Closed Nov 18, 2024

East Cliff Ave Between 18th Ave And 19th Ave, Santa Cruz, CA 95062 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1541(K)(1)
Other-than-serious$560$560Dec 13, 2023Final

Inspection 346688351 OPENED MAY 8, 2023Closed

Referral · Partial · Health · 500 employees at the site · Closed Jul 7, 2025

1401 Corta Way, Sacramento, CA 95834 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 345268593 OPENED APR 21, 2021Closed

Planned · Partial · Safety · 100 employees at the site · Closed Apr 21, 2021

Presidio Trust Play Ground Project, San Francisco, CA 94129 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.54(d) · Nonionizing radiation
Other-than-serious$0$0May 10, 2021Final

Inspection 342792629 OPENED NOV 27, 2017Closed

Accident · Partial · Safety · 400 employees at the site · Closed Apr 20, 2020

344 High St., Oakland, CA 94601 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Incident on Nov 6, 2017: Employee splashed by hot oil incurs chemical burns

At 1:55 p.m. on November 6, 2017, Employee #1, employed by a heavy construction company, was filling a 300-gallon portable fill pot with SS 1H emulsion oil heated to a temperature of 100 to 110 degrees Fahrenheit. The nozzle failed, and the leaking oil splashed onto Employee #1. He required treatment for chemical burns to his face, eyes, and chest.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 2
29 CFR 3400(C)
Other-than-serious$560$560Jan 30, 2018Final
Citation 2, item 1
29 CFR 3382(C)
Other-than-serious$8,435$8,435Jan 30, 2018Final

Inspection 342544970 OPENED AUG 14, 2017Closed

Accident · Partial · Safety · 50 employees at the site · Closed Nov 16, 2018

175 Beale Street, San Francisco, CA 94105 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Incident on Jul 28, 2017: Worker falls from planter box and fractures pelvis

At 2:30 p.m. on July 28, 2017, Employee #1, employed by a heavy construction company, was rigging an 18-foot tall palm tree in preparation for hoisting and moving it from a planter box to another location approximately 20 feet away. Employee #1 climbed on top of the planter box to double check his rigging. As he descended from the box, he fell. Emergency services were called, and Employee #1 was transported to the hospital. He was admitted and treated for a fractured right pelvis.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 342(A)
Other-than-serious$5,000$2,000Sep 18, 2017Final

Inspection 341067635 OPENED NOV 19, 2015Closed

Planned · Complete · Safety · 200 employees at the site · Closed Feb 10, 2016

Riley Avenue V Ditch Project San Francisco Presidio, San Francisco, CA 94129 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.200(g)(1) · Accident prevention signs and tags
Other-than-serious$2,754$2,754Dec 3, 2015Final
Citation 1, item 1b
29 CFR 1926.200(g)(2) · Accident prevention signs and tags
Other-than-serious$0$0Dec 3, 2015Final
Citation 1, item 2 Other-than-serious$1,756$1,756Dec 3, 2015Final
24 older inspections

Inspection 340350685 OPENED FEB 19, 2015Closed

Planned · Partial · Safety · 150 employees at the site · Closed Mar 16, 2015

7000 Bollinger Canyon Road, San Ramon, CA 94582 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 339840035 OPENED JUL 2, 2014Closed

Planned · Partial · Safety · 300 employees at the site · Closed Oct 6, 2014

Officer's Club Retaining Wall Demolition Presidio Of San Francisco, San Francisco, CA 94129 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 316522952 OPENED JUN 18, 2013Closed

Planned · Partial · Safety · 500 employees at the site · Closed Jul 3, 2013

Intersection Of Dorsey Dr & Hwy 49, Grass Valley, CA 95945 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 315774612 OPENED AUG 2, 2012Closed

Unprogrammed related · Partial · Safety · 6 employees at the site · Closed Dec 21, 2012

368 Lakeside Dr., Foster City, CA 94404 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 315316992 OPENED FEB 2, 2012Closed

Unprogrammed related · Partial · Safety · 332 employees at the site · Closed Apr 12, 2012

10 10th St, Oakland, CA 94607 · Industrial Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 310099684 OPENED APR 20, 2011Closed

Accident · Partial · Safety · 300 employees at the site · Closed Nov 29, 2011

1700 West Hillsdale, San Mateo, CA 94402 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

Incident on Apr 20, 2011: Employee is injured by flying debris from tire blowout

At approximately 3:00 p.m. on April 20, 2011, Employee #1 was working as a pavin g crew foreman at a parking lot construction job located on the campus of a loca l college. Employee #2 was working as the driver of a CAT AP-1055D Track Asphalt Paver, and was working in the vicinity of a dump truck that was loading asphalt into the paver. There had been over 40 similar loads made that day, all with th e hitch arm assembly of the paver fully extended outward to allow the truck bed to get in a clear position for the dump. A spotter had also been present for all of these earlier loads, and the job of this spotter was to assist the alignment of the paver and truck. On this particular dump, the paver's operator was not a ware that he had laterally retracted the left and right hitch arms at the front of the paver, moving the arms inward, while the dump truck carrying asphalt was backing up to offload asphalt into the paver's hopper. The spotter was also abse nt during this particular dump. The dump truck pulled in at an angle and the pav er's left hitch arm was embedded between the outside and inside left rear tires on the rear axle of the dump truck. Employee #2 then drove the paver forward for about 15 feet before stopping with the hitch arm stuck in the rear tires. Emplo yee #1 was called to the scene of the accident and tried to determine a way of d isengaging the two vehicles. Employee #1 was standing between an adjacent roadwa y gate and within three feet of the vehicles. There was a blowout of the inside right tire of the dump truck. Employee #1 said he took one or two steps backward and was unconscious for a time where he landed on the opposite side of the gate rail. Employee #1 suffered initial bruising and concussive injuries to his ribs , head, neck and back and non-permanent facial dermal injuries from mixed flying debris from the tire blowout. He was hospitalized for over 24 hours at Stanford Hospital. The Division did not issue an accident-related citation because no vi olation of Title 8 of the California Code of Regulations was determined to have caused the accident. Operator error appeared to be a primary factor in the incid ent. However, the operator had at least 3 years of experience in that position. Employer stated there had never been a prior instance of this particular sequenc e of events or results and has taken effective steps to ensure or limit the chan ce of such reoccurrence. The general contractor was not involved in any of the i mmediate events leading up to the incident and had no knowledge of it while it w as in progress. General citations unrelated to the accident were issued to both employers for failure to document all required heat illness prevention procedure s in writing.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 3395 F03
Other-than-serious$300$0Oct 13, 2011Final

Inspection 120207378 OPENED SEP 22, 2009Closed

Planned · Partial · Safety · 100 employees at the site · Closed Oct 1, 2009

3536 Butte Campus Dr, Oroville, CA 95965 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 125619528 OPENED SEP 22, 2009Closed

Planned · Partial · Health · 6 employees at the site · Closed Oct 7, 2009

Corner Of Folsom And Fremont Streets, San Francisco, CA 94105 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 313226383 OPENED JUN 1, 2009Closed

Unprogrammed other · Partial · Safety · 101 employees at the site · Closed Oct 5, 2010

9850 Lotz Pkwy, Elk Grove, CA 95757 · Other Heavy and Civil Engineering Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 312572183 OPENED DEC 12, 2008Closed

Complaint · No inspection · Safety · Closed Dec 12, 2008

7th Street Bridge Off Tuolume & 13 Street, Modesto, CA 95351 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 312572100 OPENED DEC 4, 2008Closed

Complaint · No inspection · Safety · Closed Dec 4, 2008

7th Street Bridge Off Tuolume & 13 Street, Modesto, CA 95351 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 311067417 OPENED AUG 30, 2007Closed

Planned · Partial · Health · 55 employees at the site · Closed Sep 28, 2007

John Muir Medical Center, 1601 Ygnacio Valley Blvd, Walnut Creek, CA 94598 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 307340398 OPENED NOV 23, 2005Closed

Accident · Partial · Safety · 165 employees at the site · Closed Mar 22, 2007

6899 Smith Ave, Newark, CA 94560 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

Incident on Nov 9, 2005: Employee is injured while jumping from equipment

At approximately 12:30 p.m. on September 9, 2005, Employee #1 was operating a re nted Bomag Roller BW 124 PDH-3 to compact soil that contained class two rock app roximately 1.5 in. deep. The roller was equipped with ROPS/FOPS and a seat belt. As he was backing up, a rear tire hit a pile of rocks and the roller tipped tow ards the left side. Employee #1unbuckled his seat belt and tried to jump out of the roller. The ROPS partially crushed his chest and pinned him to the ground. C oworkers used lumber to lift the roller and extricate Employee #1. He was hospit alized at Eden Medical Center for multiple left rib fractures, a collapsed lung, and a vertebra fracture.

No citations from this inspection.

Inspection 309363174 OPENED OCT 11, 2005Closed

Complaint · No inspection · Safety · Closed Dec 7, 2005

Corner Of Midas And Pacific Taylor Rd., Rocklin, CA 95677 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 125717546 OPENED MAR 12, 2004Closed

Planned · Partial · Safety · 12 employees at the site · Closed Aug 29, 2006

6037 Taylor Rd., Rocklin, CA 95677 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 301141735 OPENED NOV 25, 2003Closed

Planned · Complete · Safety · 7 employees at the site · Closed Dec 23, 2003

Int Of Alvarado Blvd & Fair Ranch Street, Union City, CA 94587 · Other Heavy and Civil Engineering Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 6151 E03
Other-than-serious$0$0Dec 9, 2003Closed

Inspection 300740107 OPENED MAY 21, 2003Closed

Programmed other · Partial · Health · 175 employees at the site · Closed Aug 7, 2003

9009 Railroad Ave, Oakland, CA 94603 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 120019336 OPENED JAN 22, 1998Closed

Planned · No inspection · Safety · Closed Apr 22, 1998

Thornton Ave Between I-880 To Fremont Blvd, Fremont, CA 94536 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 125644070 OPENED JUL 18, 1997Closed

Accident · Partial · Safety · 75 employees at the site · Closed Sep 17, 1997

761 Pine St, Livermore, CA 94550 · OSHA's record · Phone and website on Google Maps

Incident on Sep 6, 1996: Employee injures knee jumping from pipe to trench embankment

At approximately 2:45 p.m. on September 6, 1996, Employee #1, a pipe-layer/labor er with McGuire and Hester Construction of Oakland, CA, was installing a 36 in. diameter sewer line in a trench. He jumped from the top of the pipe to the trenc h embankment, injuring his right knee when he landed on it. Employee #1 refused medical assistance and continued to work, but as he was laying the next pipe he complained to his foreman about the pain in his knee. The foreman again offered Employee #1 medical assistance, but he declined and drove himself home. No accid ent-related citations were issued.

No citations from this inspection.

Inspection 119743177 OPENED JUL 21, 1995Closed

Complaint · Complete · Safety · 6 employees at the site · Closed May 11, 2007

1300 Black Willow Road, Menlo Park, CA 94025 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 3410001 F03
Other-than-serious$500$500Sep 15, 1995Final
Citation 2, item 1 Serious$500$500Sep 15, 1995Final

Inspection 111811626 OPENED FEB 2, 1994Closed

Planned · Complete · Safety · 1 employee at the site · Closed Mar 29, 1994

2246 Milvia St, Berkeley, CA 94704 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 111811634 OPENED FEB 2, 1994Closed

Planned · Complete · Safety · 6 employees at the site · Closed Feb 9, 1994

Upland Av And Roanake St, Berkeley, CA 94705 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 218249712 OPENED DEC 6, 1973Closed

Planned · Complete · Safety · 25 employees at the site · Closed Mar 10, 1984

41st Avenue & Irving, San Francisco, CA 94122 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 218250736 OPENED MAY 3, 1973Closed

Planned · Complete · Safety · 4 employees at the site · Closed Mar 10, 1984

Pierce & Eddy Streets, San Francisco, CA 94115 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(i)(1) · Excavations
Other-than-serious$60$60May 23, 1973Contested
Citation 2, item 1
29 CFR 1926.652(c) · Trench protection
Serious$800$800May 23, 1973Contested

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2023, the Oakland site logged 4 recordable injuries or illnesses among about 561 workers: 1.0 per 100 full-time workers, against a median of 1.0 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
McGuire and Hester
Oakland · 2023
561 401.01.0

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1541.1

29 CFR 1926.200 · Accident prevention signs and tags

29 CFR 1926.200(g)(1)

(g) Traffic control signs and devices. (1) At points of hazard, construction areas shall be posted with legible traffic control signs and protected by traffic control devices.

29 CFR 1926.200(g)(2)

(2) The design and use of all traffic control devices, including signs, signals, markings, barricades, and other devices, for protection of construction workers shall conform to Part 6 of the MUTCD (incorporated by reference, see § 1926.6).

29 CFR 1926.54 · Nonionizing radiation

29 CFR 1926.54(d)

(d) Areas in which lasers are used shall be posted with standard laser warning placards.

29 CFR 1926.600 · Equipment

29 CFR 1926.651 · Excavations

29 CFR 1926.652 · Trench protection

Other highway, street, and bridge construction employers in California

Alert subscribers get notified of each newly cited employer in California the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.