OSHA SearchOSHA records by employer

McNeil Sheet Metal, LLC: OSHA inspections and violations

White River Junction, Vermont · Plumbing, Heating, and Air-Conditioning Contractors · NAICS 238220

1inspections
6citation items
$4,000current penalties
Feb 12, 2020last inspection

OSHA has inspected McNeil Sheet Metal, LLC once in Vermont.

The inspection began on Feb 12, 2020, in White River Junction.

That inspection ended with 6 citation items: 6 serious.

Penalties were first proposed at $10,958 and now stand at $4,000, 63% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 2 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and McNeil Sheet Metal, LLC averages $4,000 (1 cited inspection).

McNeil Sheet Metal, LLC: OSHA citation items per year, 2020 to 2020
Citation items per year, by inspection date.

Vermont · latest 90 days of OSHA records

24employers cited

Get notified the morning OSHA posts each new citation in Vermont: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Vermont

Checking a subcontractor, a client or your own company? Watch McNeil Sheet Metal, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344623301 OPENED FEB 12, 2020Closed

Programmed other · Partial · Safety · 5 employees at the site · Closed Dec 22, 2020

87 Maple St., White River Junction, VT 05001 · Plumbing, Heating, and Air-Conditioning Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.350(a)(6) · Gas welding and cutting
Serious$1,735$728Apr 30, 2020Final
Citation 1, item 2
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Serious$1,705$693Apr 30, 2020Final
Citation 1, item 3a
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$3,470$867Apr 30, 2020Final
Citation 1, item 3b
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$0$0Apr 30, 2020Final
Citation 1, item 4a
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$4,048$1,712Apr 30, 2020Final
Citation 1, item 4b
29 CFR 1926.503(b)(1) · Fall protection training in construction
Serious$0$0Apr 30, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.350 · Gas welding and cutting

29 CFR 1926.350(a)(6)

(6) Unless cylinders are firmly secured on a special carrier intended for this purpose, regulators shall be removed and valve protection caps put in place before cylinders are moved.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(i)

(b) Branch circuits—(1) Ground-fault protection—(i) General. The employer shall use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. These requirements are in addition to any other requirements for equipment grounding conductors.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(f)(7)

(7) Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Such activities shall be performed only by experienced and trained employees selected for such work by the competent person.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

Other plumbing, heating, and air-conditioning contractors employers in Vermont

Alert subscribers get notified of each newly cited employer in Vermont the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.