OSHA SearchOSHA records by employer

MCR Construction, Inc.: OSHA inspections and violations

Marblehead, Massachusetts · Residential Remodelers · NAICS 236118

5inspections
13citation items
$41,349current penalties
Jul 20, 2026last inspection

OSHA has inspected MCR Construction, Inc. 5 times in Massachusetts since 2010.

The latest one began on Jul 20, 2026 on a referral, in Roxbury; the case is still open.

Those inspections ended with 13 citation items: 11 serious and 2 repeat.

Penalties were first proposed at $41,349 and still stand at $41,349.

Scaffolds, general requirements comes up most often in these citations: 6 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and MCR Construction, Inc. averages $13,783 (3 cited inspections).

MCR Construction, Inc.: OSHA citation items per year, 2010 to 2026
Citation items per year, by inspection date.

Massachusetts · latest 90 days of OSHA records

242employers cited

5 of them in the same industry

Get notified the morning OSHA posts each new citation in Massachusetts: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Massachusetts

Checking a subcontractor, a client or your own company? Watch MCR Construction, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 349062547 OPENED JUL 20, 2026Open

Referral · Partial · Safety · 3 employees at the site · Open

20-22 Gardner Street, Roxbury, MA 02118 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$3,618$3,618Aug 11, 2026Contested
Citation 1, item 2
29 CFR 1926.451(h)(1) · Scaffolds, general requirements
Serious$2,170$2,170Aug 11, 2026Contested
Citation 1, item 3
29 CFR 1926.501(b)(14) · Fall protection in construction
Serious$3,618$3,618Aug 11, 2026Contested
Citation 2, item 1
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Repeat$8,513$8,513Aug 11, 2026Contested
Citation 2, item 2
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Repeat$8,513$8,513Aug 11, 2026Contested

Inspection 345937791 OPENED MAY 2, 2022Closed

Complaint · No inspection · Safety · 4 employees at the site · Closed Sep 30, 2022

1463 Dorchester Ave., Dorchester, MA 02124 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 345829014 OPENED MAR 10, 2022Closed

Complaint · Complete · Safety · 3 employees at the site · Closed Aug 22, 2022

120 Pleasant Street, Marblehead, MA 01945 · Residential Remodelers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(10) · Fall protection in construction
Serious$4,351$4,351Jun 30, 2022Final

Inspection 345537872 OPENED SEP 20, 2021Closed

Referral · Complete · Safety · 3 employees at the site · Closed Jul 28, 2023

124 Pleasant Street, Marblehead, MA 01945 · Residential Remodelers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.304(i)(1) · Woodworking tools
Serious$3,729$3,729Jan 21, 2022Final
Citation 1, item 2a
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Serious$2,486$2,486Jan 21, 2022Final
Citation 1, item 2b
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Serious$0$0Jan 21, 2022Final
Citation 1, item 3a
29 CFR 1926.451(b)(4) · Scaffolds, general requirements
Serious$4,351$4,351Jan 21, 2022Final
Citation 1, item 3b
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$0$0Jan 21, 2022Final
Citation 1, item 3c
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$0$0Jan 21, 2022Final
Citation 1, item 3d
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$0$0Jan 21, 2022Final

Inspection 313801078 OPENED JUL 15, 2010Closed

Planned · Complete · Safety · 5 employees at the site · Closed Jul 15, 2010

302 Eustis Street, Boston, MA 02119 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.304 · Woodworking tools

29 CFR 1926.304(i)(1)

(i) Hand-fed ripsaws. (1) Each circular hand-fed ripsaw shall be guarded by a hood which shall completely enclose that portion of the saw above the table and that portion of the saw above the material being cut. The hood and mounting shall be arranged so that the hood will automatically adjust itself to the thickness of and remain in contact with the material being cut but it shall not offer any considerable resistance to insertion of material to saw or to passage of the material being sawed. The hood shall be made of adequate strength to resist blows and strains incidental to reasonable operation, adjusting, and handling, and shall be so designed as to protect the operator from flying splinters and broken saw teeth. It shall be made of material that is soft enough so that it will be unlikely to cause tooth breakage. The hood shall be so mounted as to insure that its operation will be po

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(f)(6)

(6) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(g)(2)(iv)

(iv) Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.501 · Fall protection in construction

Other residential remodelers employers in Massachusetts

Alert subscribers get notified of each newly cited employer in Massachusetts the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.