MCV Contracting, Inc.: OSHA inspections and violations

Miami, Florida · Structural Steel and Precast Concrete Contractors · NAICS 238120

3inspections
4citation items
$12,264current penalties
Dec 2, 2024last inspection

MCV Contracting, Inc. has 3 OSHA inspections on record in Florida, the first in 2017.

OSHA's last visit started on Dec 2, 2024 on a referral, in Bal Harbour.

Across those inspections OSHA issued 4 citation items: 2 serious and 2 other-than-serious.

OSHA proposed $23,154 in penalties. After settlements and reviews the total is $12,264, down 47%.

Most often, OSHA cited 1926.404, ground-fault protection on job sites (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. MCV Contracting, Inc. averages $6,132 over 2 cited inspections in that time.

It reported 3 severe injuries to OSHA since 2015.

MCV Contracting, Inc.: OSHA citation items per year, 2017 to 2024
Citation items per year, by inspection date.

Want to know if OSHA cites MCV Contracting, Inc. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 347908790 OPENED DEC 2, 2024Closed

Referral · Partial · Safety · 52 employees at the site · Closed May 6, 2025

9700 Collins Ave, Bal Harbour, FL 33154 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 347080285 OPENED NOV 2, 2023Closed

Referral · Partial · Safety · 30 employees at the site · Closed May 22, 2024

930 Ne 1 Avenue, Miami, FL 33132 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.250(a)(1) · General requirements for storage
Serious$6,857$4,115Apr 24, 2024Final

Inspection 342300076 OPENED MAY 3, 2017Closed

Referral · Partial · Safety · 95 employees at the site · Closed Mar 7, 2018

300 Se 3rd St, Miami, FL 33133 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Incident on May 2, 2017: Employee falls 36 feet and is hospitalized

At 7:00 a.m. on May 2, 2017, an employee was on his way to hook a precast stairway to a tower crane. The employee fell 36 feet approximately to a lower level, and was hospitalized.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Other-than-serious$7,243$3,622Oct 18, 2017Final
Citation 1, item 1b
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Other-than-serious$0$0Oct 18, 2017Final
Citation 1, item 2
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
Serious$9,054$4,527Oct 18, 2017Final

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 3 reports on file.

Nov 26, 2024, Bal Harbour: Hospitalization · fractures · trunk and other upper extremities

An employee was climbing a ladder and fell approximately 10-12 feet to the wooden access platform below. They sustained a broken wrist and fractured ribs.

Oct 31, 2023, Miami: Hospitalization · fractures · lower leg(s)

An employee was rigging and signaling a wall form. His lower right leg was struck by the wall form resulting in fractures to the tibia and fibula.

May 2, 2017, Miami: Hospitalization · traumatic injuries and disorders, unspecified · nonclassifiable

On May 2, 2017, at 7:00 a.m., an employee was performing concrete work when he fell four floors through an opening in a core shaft and was injured, requiring hospitalization.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.250 · General requirements for storage

29 CFR 1926.250(a)(1)

(a) General. (1) All materials stored in tiers shall be stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling or collapse.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(i)

(b) Branch circuits—(1) Ground-fault protection—(i) General. The employer shall use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. These requirements are in addition to any other requirements for equipment grounding conductors.

29 CFR 1926.404(f)(6)

(6) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous.

29 CFR 1926.701 · Concrete and Masonry Construction: general requirements

Other structural steel and precast concrete contractors employers in Florida

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.