OSHA SearchOSHA records by employer

Meeks Group: OSHA inspections and violations

Tulsa, Oklahoma · Commercial Printing (except Screen and Books) · NAICS 323111

1inspections
7citation items
$4,900current penalties
May 29, 2015last inspection

OSHA inspectors have visited Meeks Group in Oklahoma one time.

It opened on May 29, 2015 as a planned inspection, in Tulsa.

In all, OSHA issued 7 citation items: 6 serious and 1 other-than-serious.

The proposed penalties came to $9,800; today they stand at $4,900, 50% less.

The rule cited most here is 1910.147 (lockout/tagout), 3 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $4,500 penalty. Meeks Group averages $4,900 across 1 cited inspection.

Meeks Group: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Want to know if OSHA cites Meeks Group again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 340667211 OPENED MAY 29, 2015Closed

Planned · Partial · Safety · 54 employees at the site · Closed Nov 24, 2015

6913 E. 13th St., Tulsa, OK 74112 · Commercial Printing (except Screen and Books) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a Serious$3,500$1,750Sep 29, 2015Final
Citation 1, item 1b
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$0$0Sep 29, 2015Final
Citation 1, item 2
29 CFR 1910.212(a)(1) · Machine guarding
Serious$3,500$1,750Sep 29, 2015Final
Citation 1, item 3a
29 CFR 1910.303(f)(2) · Electrical equipment, general requirements
Serious$2,800$1,400Sep 29, 2015Final
Citation 1, item 3b
29 CFR 1910.303(g)(1)(i)(a) · Electrical equipment, general requirements
Serious$0$0Sep 29, 2015Final
Citation 1, item 3c
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Serious$0$0Sep 29, 2015Final
Citation 2, item 1
29 CFR 1910.147(c)(5)(ii) · Lockout/tagout
Other-than-serious$0$0Sep 29, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(ii)(b)

(B) Specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy;

29 CFR 1910.147(c)(5)(ii)

(ii) Lockout devices and tagout devices shall be singularly identified; shall be the only devices(s) used for controlling energy; shall not be used for other purposes; and shall meet the following requirements:

29 CFR 1910.147(c)(6)(i)

(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.

29 CFR 1910.212 · Machine guarding

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

Other commercial printing (except screen and books) employers in Oklahoma

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.