OSHA SearchOSHA records by employer

Merino Construction LLC: OSHA inspections and violations

Pewaukee, Wisconsin · Roofing Contractors · NAICS 238160

3inspections
14citation items
$33,335current penalties
Jan 13, 2026last inspection

Since 2025, OSHA inspectors have visited Merino Construction LLC in Wisconsin 3 times.

The most recent inspection opened on Jan 13, 2026 as a planned inspection, in Waukesha and is still open.

In all, OSHA issued 14 citation items: 7 serious, 2 repeat and 5 other-than-serious.

The proposed penalties came to $39,095; today they stand at $33,335, 15% less.

The rule cited most here is 1903.19 (proving cited hazards were fixed), 5 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Merino Construction LLC averages $11,112 across 3 cited inspections.

Merino Construction LLC: OSHA citation items per year, 2025 to 2026
Citation items per year, by inspection date.

Wisconsin · latest 90 days of OSHA records

223employers cited

44 of them in the same industry

Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Wisconsin

Checking a subcontractor, a client or your own company? Watch Merino Construction LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348686254 OPENED JAN 13, 2026Open

Planned · Partial · Safety · 8 employees at the site · Open

110 Retzer View Court, Waukesha, WI 53188 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Serious$5,958$4,766Jan 23, 2026Final
Citation 1, item 2a
29 CFR 1926.502(d)(10)(i) · Fall protection systems
Serious$5,107$4,085Jan 23, 2026Final
Citation 1, item 2b
29 CFR 1926.502(d)(17) · Fall protection systems
Serious$0$0Jan 23, 2026Final
Citation 1, item 3
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$3,405$2,721Jan 23, 2026Final
Citation 2, item 1a
29 CFR 1926.501(b)(13) · Fall protection in construction
Repeat$11,916$9,532Jan 23, 2026Final
Citation 2, item 1b
29 CFR 1926.503(a)(1) · Fall protection training in construction
Repeat$0$0Jan 23, 2026Final
Citation 3, item 1
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$478$0Mar 16, 2026Final

Inspection 348276726 OPENED MAY 29, 2025Open

Planned · Partial · Safety · 6 employees at the site · Open

1727 N. River Circle, River Hills, WI 53217 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$2,837$2,837Jul 23, 2025Final
Citation 1, item 2
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$2,837$2,837Jul 23, 2025Final
Citation 2, item 1
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$398$398Sep 30, 2025Final
Citation 2, item 2
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$398$398Sep 30, 2025Final

Inspection 348245093 OPENED MAY 14, 2025Open

Referral · Partial · Safety · 5 employees at the site · Open

436 Sandy Circle, Pewaukee, WI 53072 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$4,965$4,965Jul 23, 2025Final
Citation 2, item 1
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$398$398Sep 30, 2025Final
Citation 2, item 2
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$398$398Sep 30, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(c)(1)

(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.

29 CFR 1903.19(d)(1)

(d) Abatement documentation. (1) The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.502 · Fall protection systems

29 CFR 1926.503 · Fall protection training in construction

Other roofing contractors employers in Wisconsin

Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.