Inspection 341986586 OPENED DEC 20, 2016Closed
503 Geyser Rd., Ballston Spa, NY 12020 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Ballston Spa, New York · Highway, Street, and Bridge Construction · NAICS 237310
Since 1998, OSHA inspectors have visited Milton TN. HWY. Dept. in New York 4 times.
The most recent inspection opened on Dec 20, 2016 to follow up on an earlier case, in Ballston Spa.
In all, OSHA issued 19 citation items: 10 serious and 9 other-than-serious.
No penalty came with these citations.
The rule cited most here is 1910.305 (electrical wiring methods), 4 times.
Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Milton TN. HWY. Dept. averages $0 across 1 cited inspection.
New York · latest 90 days of OSHA records
362employers cited
22 of them in the same industry
Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in New York
Checking a subcontractor, a client or your own company? Watch Milton TN. HWY. Dept. and get notified the morning OSHA posts a new citation for it.
Watch this company503 Geyser Rd., Ballston Spa, NY 12020 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
503 Geyser Rd., Ballston Spa, NY 12020 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.37(a)(4) · Exit routes |
Serious | $0 | $0 | Sep 28, 2016 | Final |
| Citation 1, item 2 29 CFR 1910.147(c)(4)(i) · Lockout/tagout |
Serious | $0 | $0 | Sep 28, 2016 | Final |
| Citation 1, item 3 29 CFR 1910.147(c)(7)(i)(a) · Lockout/tagout |
Serious | $0 | $0 | Sep 28, 2016 | Final |
| Citation 1, item 4 29 CFR 1910.212(b) · Machine guarding |
Serious | $0 | $0 | Sep 28, 2016 | Final |
| Citation 1, item 5 29 CFR 1910.215(a)(4) · Grinders and abrasive wheels |
Serious | $0 | $0 | Sep 28, 2016 | Final |
| Citation 1, item 6 29 CFR 1910.304(a)(2) · Grounding and circuit protection |
Serious | $0 | $0 | Sep 28, 2016 | Final |
| Citation 1, item 7 29 CFR 1910.305(b)(2)(i) · Electrical wiring methods |
Serious | $0 | $0 | Sep 28, 2016 | Final |
| Citation 1, item 8 29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods |
Serious | $0 | $0 | Sep 28, 2016 | Final |
| Citation 1, item 9 29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods |
Serious | $0 | $0 | Sep 28, 2016 | Final |
503 Geyser Rd., Ballston Spa, NY 12020 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
503 Geyser Rd., Ballston Spa, NY 12020 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.253(a)(1) · Gas welding and cutting |
Serious | $0 | $0 | Mar 26, 1999 | Closed |
| Citation 2, item 1 29 CFR 1910.22(d)(1) · General requirements |
Other-than-serious | $0 | $0 | Mar 26, 1999 | Closed |
| Citation 2, item 2 29 CFR 1910.36(d)(2) · Exit route design |
Other-than-serious | $0 | $0 | Mar 26, 1999 | Closed |
| Citation 2, item 3 29 CFR 1910.146(c)(4) · Permit-required confined spaces |
Other-than-serious | $0 | $0 | Mar 26, 1999 | Closed |
| Citation 2, item 4 29 CFR 1910.147(c)(1) · Lockout/tagout |
Other-than-serious | $0 | $0 | Mar 26, 1999 | Closed |
| Citation 2, item 5 29 CFR 1910.157(e)(3) · Portable fire extinguishers |
Other-than-serious | $0 | $0 | Mar 26, 1999 | Closed |
| Citation 2, item 6 29 CFR 1910.303(b)(1)(ii) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Mar 26, 1999 | Closed |
| Citation 2, item 7 29 CFR 1910.303(f) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Mar 26, 1999 | Closed |
| Citation 2, item 8 29 CFR 1910.305(b)(1) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Mar 26, 1999 | Closed |
| Citation 2, item 9 29 CFR 8010003 A01 |
Other-than-serious | $0 | $0 | Mar 26, 1999 | Closed |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.146(c)(4)
(4) If the employer decides that its employees will enter permit spaces, the employer shall develop and implement a written permit space program that complies with this section. The written program shall be available for inspection by employees and their authorized representatives.
29 CFR 1910.147(c)(1)
(c) General—(1) Energy control program. The employer shall establish a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, start up or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source, and rendered inoperative.
29 CFR 1910.147(c)(4)(i)
(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.
Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.