OSHA SearchOSHA records by employer

ML Construction: OSHA inspections and violations

American Fork, Utah · Poured Concrete Foundation and Structure Contractors · NAICS 238110

1inspections
3citation items
$750current penalties
May 19, 2015last inspection

OSHA inspectors have visited ML Construction in Utah one time.

It opened on May 19, 2015 as a planned inspection, in American Fork.

In all, OSHA issued 3 citation items: 3 serious.

The proposed penalties came to $1,500; today they stand at $750, 50% less.

The rule cited most here is 1926.403 (electrical equipment on job sites), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,078 penalty. ML Construction averages $750 across 1 cited inspection.

ML Construction: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Want to know if OSHA cites ML Construction again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 340641299 OPENED MAY 19, 2015Closed

Planned · Partial · Safety · 5 employees at the site · Closed Jul 29, 2015

43 E 1450 N N 40 24.353 W 111 47.717, American Fork, UT 84003 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.403(b)(1)(iii) · Electrical equipment on job sites
Serious$1,500$750Jun 12, 2015Final
Citation 1, item 1b
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Serious$0$0Jun 12, 2015Final
Citation 1, item 1c
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Serious$0$0Jun 12, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(1)(iii)

(iii) Electrical insulation.

29 CFR 1926.403(b)(2)

(2) Installation and use. Listed, labeled, or certified equipment shall be installed and used in accordance with instructions included in the listing, labeling, or certification.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(f)(6)

(6) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous.

Other poured concrete foundation and structure contractors employers in Utah

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.