OSHA SearchOSHA records by employer

MMR Constructors, Inc.: OSHA inspections and violations

Alpharetta, Georgia · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210

2inspections
9citation items
$5,299current penalties
May 2, 2019last inspection

Since 1990, OSHA inspectors have visited MMR Constructors, Inc. in Georgia 2 times.

The most recent inspection opened on May 2, 2019 after a complaint, in Macon.

In all, OSHA issued 9 citation items: 9 serious.

The proposed penalties came to $8,120; today they stand at $5,299, 35% less.

The rule cited most here is 1926.405 (job-site wiring), 4 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. MMR Constructors, Inc. averages $3,864 across 1 cited inspection.

It reported 1 severe injury to OSHA since 2015.

MMR Constructors, Inc.: OSHA citation items per year, 1990 to 2019
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

138employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch MMR Constructors, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343980066 OPENED MAY 2, 2019Closed

Complaint · Complete · Safety · 100 employees at the site · Closed Jun 4, 2019

Irving Tissue Plant 1897 Allen Road, Macon, GA 31216 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.21(b)(2) · Construction safety training
Serious$6,440$3,864May 14, 2019Final

Inspection 18345629 OPENED JAN 10, 1990Closed

Unprogrammed related · Complete · Safety · 15 employees at the site · Closed Mar 13, 1990

9750 Spruill Road, Alpharetta, GA 30201 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 2
29 CFR 1926.403(d)(2)(i) · Electrical equipment on job sites
Serious$490$245Jan 23, 1990Closed
Citation 1, item 10a
29 CFR 1926.404(a)(2) · Ground-fault protection on job sites
Serious$560$560Jan 23, 1990Closed
Citation 1, item 10b
29 CFR 1926.404(b)(1) · Ground-fault protection on job sites
Serious$0$0Jan 23, 1990Closed
Citation 1, item 10c
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Serious$0$0Jan 23, 1990Closed
Citation 1, item 11a
29 CFR 1926.405(a)(2)(iii) · Job-site wiring
Serious$630$630Jan 23, 1990Closed
Citation 1, item 11b
29 CFR 1926.405(e)(1) · Job-site wiring
Serious$0$0Jan 23, 1990Closed
Citation 1, item 11c
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Serious$0$0Jan 23, 1990Closed
Citation 1, item 11d
29 CFR 1926.405(g)(2)(v) · Job-site wiring
Serious$0$0Jan 23, 1990Closed

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.

Nov 30, 2018, Macon: Hospitalization · fractures · thigh(s)

An employee was carrying a tent with three other employees when he stepped in a grassy area and fell, fracturing his right femur.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.21 · Construction safety training

29 CFR 1926.21(b)(2)

(2) The employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(d)(2)(i)

(2) Cooling. Electrical equipment which depends upon the natural circulation of air and convection principles for cooling of exposed surfaces shall be installed so that room air flow over such surfaces is not prevented by walls or by adjacent installed equipment. For equipment designed for floor mounting, clearance between top surfaces and adjacent surfaces shall be provided to dissipate rising warm air. Electrical equipment provided with ventilating openings shall be installed so that walls or other obstructions do not prevent the free circulation of air through the equipment.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(a)(2)

(2) Polarity of connections. No grounded conductor shall be attached to any terminal or lead so as to reverse designated polarity.

29 CFR 1926.405 · Job-site wiring

Other electrical contractors and other wiring installation contractors employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.