OSHA SearchOSHA records by employer

MNW Construction LLC.: OSHA inspections and violations

Carson City, Nevada · Commercial and Institutional Building Construction · NAICS 236220

1inspections
2citation items
$3,795current penalties
Apr 13, 2023last inspection

MNW Construction LLC. has one OSHA inspection on record in Nevada.

OSHA opened it on Apr 13, 2023 on a referral, in Carson City.

From that inspection OSHA issued 2 citation items: 2 serious.

OSHA proposed $7,590 in penalties. After settlements and reviews the total is $3,795, down 50%.

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. MNW Construction LLC. averages $3,795 over 1 cited inspection in that time.

MNW Construction LLC.: OSHA citation items per year, 2023 to 2023
Citation items per year, by inspection date.

Nevada · latest 90 days of OSHA records

115employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Nevada: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Nevada

Checking a subcontractor, a client or your own company? Watch MNW Construction LLC. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346636699 OPENED APR 13, 2023Closed

Referral · Partial · Safety · 6 employees at the site · Closed Oct 23, 2023

907 South Carson Street, Carson City, NV 89706 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(k)(1) · Excavations
Serious$3,795$1,898Jul 19, 2023Final
Citation 1, item 2
29 CFR 1926.652(c)(2)(i) · Trench protection
Serious$3,795$1,898Jul 19, 2023Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.651 · Excavations

29 CFR 1926.651(k)(1)

(k) Inspections. (1) Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.

29 CFR 1926.652 · Trench protection

29 CFR 1926.652(c)(2)(i)

(2) Option (2)—Designs Using Manufacturer's Tabulated Data. (i) Design of support systems, shield systems, or other protective systems that are drawn from manufacturer's tabulated data shall be in accordance with all specifications, recommendations, and limitations issued or made by the manufacturer.

Other commercial and institutional building construction employers in Nevada

Alert subscribers get notified of each newly cited employer in Nevada the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.