OSHA SearchOSHA records by employer

Mohns, Inc.: OSHA inspections and violations

Milwaukee, Wisconsin · Framing Contractors · NAICS 238130

4inspections
8citation items
$3,550current penalties
Aug 20, 2019last inspection

Mohns, Inc. has 4 OSHA inspections on record in Wisconsin, the first in 1993.

OSHA's last visit started on Aug 20, 2019 as a planned inspection, in Franklin.

Across those inspections OSHA issued 8 citation items: 5 serious and 3 other-than-serious.

OSHA proposed $8,109 in penalties. After settlements and reviews the total is $3,550, down 56%.

Most often, OSHA cited 1926.451, scaffolds, general requirements (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Mohns, Inc. averages $1,500 over 1 cited inspection in that time.

Mohns, Inc.: OSHA citation items per year, 1993 to 2019
Citation items per year, by inspection date.

Wisconsin · latest 90 days of OSHA records

232employers cited

16 of them in the same industry

Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Wisconsin

Checking a subcontractor, a client or your own company? Watch Mohns, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344245196 OPENED AUG 20, 2019Closed

Planned · Partial · Safety · 25 employees at the site · Closed Mar 20, 2020

10925 West Speedway Drive, Franklin, WI 53132 · Framing Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 342107059 OPENED FEB 15, 2017Closed

Planned · Partial · Safety · 2 employees at the site · Closed Nov 13, 2017

1900 W. Layton Ave., Milwaukee, WI 53221 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 2
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$3,259$1,500Mar 9, 2017Final

Inspection 309353381 OPENED FEB 15, 2006Closed

Planned · Partial · Safety · 50 employees at the site · Closed Apr 13, 2006

790 Cornerstone Crossing, Waterford, WI 53185 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.453(b)(2)(v) · Aerial lifts
Serious$1,250$500Mar 15, 2006Closed

Inspection 102979465 OPENED SEP 16, 1993Closed

Referral · Complete · Safety · 3 employees at the site · Closed Dec 21, 1993

8301 West Parkland Court, Milwaukee, WI 53233 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.404(b)(1)(iii) · Ground-fault protection on job sites
Other-than-serious$600$0Nov 4, 1993Closed
Citation 1, item 1b
29 CFR 1926.405(a)(2)(iij) · Job-site wiring
Other-than-serious$0$0Nov 4, 1993Closed
Citation 1, item 2a
29 CFR 1926.416(a)(1) · Electrical safety in construction
Serious$1,500$800Nov 4, 1993Closed
Citation 1, item 2b
29 CFR 1926.416(a)(3) · Electrical safety in construction
Serious$0$0Nov 4, 1993Closed
Citation 1, item 3
29 CFR 1926.451(a)(4) · Scaffolds, general requirements
Serious$1,500$750Nov 4, 1993Closed
Citation 2, item 1
29 CFR 1926.451(d)(3) · Scaffolds, general requirements
Other-than-serious$0$0Nov 4, 1993Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(iii)

(iii) Assured equipment grounding conductor program. The employer shall establish and implement an assured equipment grounding conductor program on construction sites covering all cord sets, receptacles which are not a part of the building or structure, and equipment connected by cord and plug which are available for use or used by employees. This program shall comply with the following minimum requirements:

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(a)(2)(iij)

(J) Extension cord sets used with portable electric tools and appliances shall be of three-wire type and shall be designed for hard or extra-hard usage. Flexible cords used with temporary and portable lights shall be designed for hard or extra-hard usage.

29 CFR 1926.416 · Electrical safety in construction

29 CFR 1926.416(a)(1)

(a) Protection of employees. (1) No employer shall permit an employee to work in such proximity to any part of an electric power circuit that the employee could contact the electric power circuit in the course of work, unless the employee is protected against electric shock by deenergizing the circuit and grounding it or by guarding it effectively by insulation or other means.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.453 · Aerial lifts

29 CFR 1926.503 · Fall protection training in construction

Other framing contractors employers in Wisconsin

Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.