OSHA SearchOSHA records by employer

Mollertech, LLC: OSHA inspections and violations

Shelby Twp, Michigan · All Other Plastics Product Manufacturing · NAICS 326199

8inspections
71citation items
$28,705current penalties
Jan 8, 2018last inspection

OSHA has inspected Mollertech, LLC 8 times in Michigan since 2001.

The latest one began on Jan 8, 2018 as a planned inspection, in Shelby Township.

Those inspections ended with 71 citation items: 27 serious, 9 repeat and 35 other-than-serious.

Penalties were first proposed at $55,775 and now stand at $28,705, 49% lower after settlements or reviews.

Lockout/tagout comes up most often in these citations: 13 items under 1910.147.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $4,500, and Mollertech, LLC averages $8,140 (2 cited inspections).

1 inspection on this page followed a fatal incident.

Mollertech, LLC: OSHA citation items per year, 2001 to 2018
Citation items per year, by inspection date.

Want to know if OSHA cites Mollertech, LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 342865557 OPENED JAN 8, 2018Closed

Planned · Complete · Safety · 70 employees at the site · Closed Apr 23, 2018

13877 Teresa, Shelby Township, MI 48315 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 408.11731(4)
Serious$2,000$1,000Feb 9, 2018Final
Citation 1, item 2
29 CFR 408.12176(1)
Serious$2,000$1,000Feb 9, 2018Final
Citation 1, item 3
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Serious$2,000$1,000Feb 9, 2018Final
Citation 2, item 1
29 CFR 408.13350
Repeat$6,000$3,000Feb 9, 2018Final
Citation 2, item 2a
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Repeat$6,000$3,000Feb 9, 2018Final
Citation 2, item 2b
29 CFR 408.16234(10)
Repeat$0$0Feb 9, 2018Final
Citation 2, item 2c
29 CFR 408.16227(2)
Repeat$0$0Feb 9, 2018Final
Citation 2, item 2d
29 CFR 408.11412(3)
Repeat$0$0Feb 9, 2018Final
Citation 2, item 3a
29 CFR 1910.147(c)(7)(i)(a) · Lockout/tagout
Repeat$6,000$3,000Feb 9, 2018Final
Citation 2, item 3b
29 CFR 408.16211(1)
Repeat$0$0Feb 9, 2018Final
Citation 2, item 3c
29 CFR 1910.147(c)(6)(ii) · Lockout/tagout
Repeat$0$0Feb 9, 2018Final
Citation 2, item 3d
29 CFR 1910.147(c)(7)(i)(b) · Lockout/tagout
Repeat$0$0Feb 9, 2018Final
Citation 3, item 1
29 CFR 408.10125
Other-than-serious$0$0Feb 9, 2018Final
Citation 3, item 2
29 CFR 408.11222(1)
Other-than-serious$0$0Feb 9, 2018Final
Citation 3, item 3a
29 CFR 1910.146(c)(1) · Permit-required confined spaces
Other-than-serious$0$0Feb 9, 2018Final
Citation 3, item 3b
29 CFR 1910.146(c)(2) · Permit-required confined spaces
Other-than-serious$0$0Feb 9, 2018Final
Citation 3, item 4
29 CFR 1910.1200(h)(3) · Hazard communication
Other-than-serious$0$0Feb 9, 2018Final

Inspection 340056886 OPENED MAY 28, 2015Closed

Planned · Complete · Safety · 99 employees at the site · Closed Sep 15, 2015

13877 Teresa, Shelby Township, MI 48315 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 408.10213(2)
Serious$1,500$600Jul 9, 2015Final
Citation 1, item 2
29 CFR 408.11421(4)
Serious$1,200$480Jul 9, 2015Final
Citation 1, item 3
29 CFR 408.11442(2)
Serious$1,200$600Jul 9, 2015Final
Citation 1, item 4
29 CFR 1910.305(b)(2)(i) · Electrical wiring methods
Serious$1,500$600Jul 9, 2015Final
Citation 1, item 5a
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$4,000$2,000Jul 9, 2015Final
Citation 1, item 5b
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$0$0Jul 9, 2015Final
Citation 1, item 5c
29 CFR 1910.147(c)(7)(i)(a) · Lockout/tagout
Serious$0$0Jul 9, 2015Final
Citation 1, item 5d
29 CFR 1910.147(c)(7)(i)(b) · Lockout/tagout
Serious$0$0Jul 9, 2015Final
Citation 2, item 1a
29 CFR 408.10033(1)
Other-than-serious$0$0Jul 9, 2015Final
Citation 2, item 1b
29 CFR 408.10036(1)
Other-than-serious$0$0Jul 9, 2015Final
Citation 2, item 2
29 CFR 408.10454(3)
Other-than-serious$0$0Jul 9, 2015Final
Citation 2, item 3
29 CFR 408.13312(1)
Other-than-serious$0$0Jul 9, 2015Final
Citation 2, item 4a
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Other-than-serious$0$0Jul 9, 2015Final
Citation 2, item 4b
29 CFR 1910.303(b)(7)(iv) · Electrical equipment, general requirements
Other-than-serious$0$0Jul 9, 2015Final
Citation 2, item 4c
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Other-than-serious$0$0Jul 9, 2015Final
Citation 2, item 5
29 CFR 408.14007(7)
Other-than-serious$0$0Jul 9, 2015Final
Citation 2, item 6a
29 CFR 1910.106(e)(2)(iv)(d) · Flammable liquids
Other-than-serious$0$0Jul 9, 2015Final
Citation 2, item 6b
29 CFR 1910.106(e)(6)(ii) · Flammable liquids
Other-than-serious$0$0Jul 9, 2015Final
Citation 2, item 7
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0Jul 9, 2015Final

Inspection 315412429 OPENED MAR 21, 2013Closed

Accident · Partial · Safety · 146 employees at the site · Closed Aug 1, 2013

13877 Teresa Dr, Shelby Twp, MI 48315 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Incident on Mar 21, 2013 (fatal): Overhead crane's lift bolt breaks, falling load kills worker

On March 21, 2013, Employee #1, a 39-year-old male with Mollertech LLC, was usin g an overhead crane to move injection die from storage area using wrong size lif t bolt. Lift bolt failed causing the suspended die to fall. The falling die stru ck Employee #1 and another stored die on the floor. Employee #1 was killed in th e event.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a Serious$1,500$750May 22, 2013Closed
Citation 1, item 1b Serious$0$0May 22, 2013Closed
Citation 1, item 1c Serious$0$0May 22, 2013Closed
Citation 1, item 2 Serious$4,900$2,450May 22, 2013Closed
Citation 1, item 3a Serious$4,900$2,450May 22, 2013Closed
Citation 1, item 3b Serious$0$0May 22, 2013Closed
Citation 1, item 4 Serious$1,500$750May 22, 2013Closed
Citation 1, item 5a Serious$3,500$1,750May 22, 2013Closed
Citation 1, item 5b Serious$0$0May 22, 2013Closed
Citation 2, item 1a Other-than-serious$0$0May 22, 2013Closed
Citation 2, item 1b Other-than-serious$0$0May 22, 2013Closed
Citation 2, item 2
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Other-than-serious$0$0May 22, 2013Closed

Inspection 308804970 OPENED OCT 10, 2006Closed

Planned · Complete · Safety · 150 employees at the site · Closed Feb 8, 2007

13877 Teresa Dr, Shelby Twp, MI 48315 · Other Motor Vehicle Parts Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$900$450Dec 15, 2006Closed
Citation 1, item 2 Serious$900$450Dec 15, 2006Closed
Citation 1, item 3
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$900$450Dec 15, 2006Closed
Citation 1, item 4
29 CFR 1910.147(c)(7)(ia) · Lockout/tagout
Serious$900$450Dec 15, 2006Closed
Citation 2, item 1 Other-than-serious$0$0Dec 15, 2006Closed
Citation 2, item 2 Other-than-serious$0$0Dec 15, 2006Closed
Citation 2, item 3 Other-than-serious$0$0Dec 15, 2006Closed
Citation 2, item 4 Other-than-serious$0$0Dec 15, 2006Closed
Citation 2, item 5 Other-than-serious$0$0Dec 15, 2006Closed
Citation 2, item 6
29 CFR 1910.305(b)(1) · Electrical wiring methods
Other-than-serious$0$0Dec 15, 2006Closed
Citation 2, item 7 Other-than-serious$0$0Dec 15, 2006Closed
Citation 2, item 8
29 CFR 1910.147(c)(7)(ib) · Lockout/tagout
Other-than-serious$0$0Dec 15, 2006Closed
Citation 2, item 9
29 CFR 1910.147(c)(7)(ib) · Lockout/tagout
Other-than-serious$0$0Dec 15, 2006Closed
Citation 2, item 10
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0Dec 15, 2006Closed

Inspection 127161461 OPENED DEC 12, 2001Closed

Follow-up · Partial · Safety · 120 employees at the site · Closed Dec 28, 2001

13877 Teresa Dr, Shelby Twp, MI 48315 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 127161370 OPENED NOV 27, 2001Closed

Follow-up · Partial · Safety · 120 employees at the site · Closed Dec 13, 2001

13877 Teresa Dr, Shelby Twp, MI 48315 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 127161032 OPENED JUL 18, 2001Closed

Complaint · Partial · Safety · 120 employees at the site · Closed Dec 28, 2001

13877 Teresa Dr, Shelby Twp, MI 48315 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$825$825Aug 31, 2001Closed
Citation 1, item 2
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$825$825Aug 31, 2001Closed
Citation 2, item 1 Other-than-serious$0$0Aug 31, 2001Closed
Citation 2, item 2 Other-than-serious$0$0Aug 31, 2001Closed
Citation 2, item 3 Other-than-serious$0$0Aug 31, 2001Closed
Citation 2, item 4 Other-than-serious$0$0Aug 31, 2001Closed

Inspection 127161057 OPENED JUL 18, 2001Closed

Planned · Partial · Safety · 120 employees at the site · Closed Dec 13, 2001

13877 Teresa Dr, Shelby Twp, MI 48315 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$825$825Aug 24, 2001Closed
Citation 2, item 1 Other-than-serious$0$0Aug 24, 2001Closed
Citation 2, item 2 Other-than-serious$0$0Aug 24, 2001Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(e)(2)(iv)(d)

(iv) Handling liquids at point of final use. (a) Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall be kept in covered containers when not actually in use.

29 CFR 1910.106(e)(6)(ii)

(ii) Grounding. Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall not be dispensed into containers unless the nozzle and container are electrically interconnected. Where the metallic floorplate on which the container stands while filling is electrically connected to the fill stem or where the fill stem is bonded to the container during filling operations by means of a bond wire, the provisions of this section shall be deemed to have been complied with.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.146 · Permit-required confined spaces

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

29 CFR 4080.1014

29 CFR 4081.11

29 CFR 4081.1223

29 CFR 4081.1852

29 CFR 4081.1853

29 CFR 4081.1854

29 CFR 4081.1865

29 CFR 4081.1872

29 CFR 4081.2131

29 CFR 4081.2154

29 CFR 4081.221

29 CFR 4081.3308

29 CFR 4081.3309

29 CFR 4081.3312

29 CFR 4081.3370

29 CFR 4081.36

29 CFR 4081.4007

29 CFR 4081.6223

29 CFR 4081.6227

29 CFR 4081.632

Other all other plastics product manufacturing employers in Michigan

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.