OSHA SearchOSHA records by employer

MPF Concrete LLC: OSHA inspections and violations

Doral, Florida · Commercial and Institutional Building Construction · NAICS 236220

2inspections
2citation items
$7,944current penalties
Dec 4, 2025last inspection

OSHA has inspected MPF Concrete LLC 2 times in Florida since 2023.

The latest one began on Dec 4, 2025 on a referral, in Hialeah.

Those inspections ended with 2 citation items: 2 serious.

Penalties were first proposed at $7,944 and still stand at $7,944.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and MPF Concrete LLC averages $7,944 (1 cited inspection).

It reported 2 severe injuries to OSHA since 2015.

MPF Concrete LLC: OSHA citation items per year, 2023 to 2025
Citation items per year, by inspection date.

Want to know if OSHA cites MPF Concrete LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348625195 OPENED DEC 4, 2025Closed

Referral · Partial · Safety · 12 employees at the site · Closed Nov 4, 2026

1067 East 25 Street, Hialeah, FL 33013 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.21(b)(2) · Construction safety training
Serious$3,972$3,972May 22, 2026Final
Citation 1, item 2
29 CFR 1926.416(a)(1) · Electrical safety in construction
Serious$3,972$3,972May 22, 2026Final

Inspection 346943012 OPENED AUG 28, 2023Closed

Referral · Partial · Safety · 5 employees at the site · Closed Feb 14, 2024

3450 Nw 85th Court, Doral, FL 33122 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 2 reports on file.

Nov 28, 2025, Hialeah: Hospitalization · electrical burns and electrocution · body systems and other part(s) of body

An employee was working in a column, installing a dovetail, when it got stuck. When he pulled it out, the dovetail touched a power line. He sustained an electric shock that travel from his hands to his feet. He was hospitalized with burns.

Aug 22, 2023, Doral: Hospitalization · cuts, lacerations · head, unspecified

An employee was sweeping the floor when they fell through a trash hole from one floor to another. They sustained a head laceration.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.21 · Construction safety training

29 CFR 1926.21(b)(2)

(2) The employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury.

29 CFR 1926.416 · Electrical safety in construction

29 CFR 1926.416(a)(1)

(a) Protection of employees. (1) No employer shall permit an employee to work in such proximity to any part of an electric power circuit that the employee could contact the electric power circuit in the course of work, unless the employee is protected against electric shock by deenergizing the circuit and grounding it or by guarding it effectively by insulation or other means.

Other commercial and institutional building construction employers in Florida

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.