Inspection 344210810 OPENED AUG 6, 2019Closed
198a Kent Street, Brooklyn, NY 11222 · Framing Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
OSHA has inspected MS Building Solutions Inc 2 times in New York since 2018.
The latest one began on Aug 6, 2019 to follow up on an earlier case, in Brooklyn.
Those inspections ended with 3 citation items: 3 serious.
Penalties were first proposed at $8,526 and still stand at $8,526.
Job-site wiring comes up most often in these citations: 2 items under 1926.405.
How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and MS Building Solutions Inc averages $8,526 (1 cited inspection).
New York · latest 90 days of OSHA records
353employers cited
18 of them in the same industry
Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in New York
Checking a subcontractor, a client or your own company? Watch MS Building Solutions Inc and get notified the morning OSHA posts a new citation for it.
Watch this company198a Kent Street, Brooklyn, NY 11222 · Framing Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
198a Kent St., Brooklyn, NY 11222 · Framing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.404(f)(6) · Ground-fault protection on job sites |
Serious | $2,842 | $2,842 | Mar 26, 2019 | Final |
| Citation 1, item 2 29 CFR 1926.405(a)(2)(ii)(a) · Job-site wiring |
Serious | $2,842 | $2,842 | Mar 26, 2019 | Final |
| Citation 1, item 3 29 CFR 1926.405(b)(2) · Job-site wiring |
Serious | $2,842 | $2,842 | Mar 26, 2019 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.404(f)(6)
(6) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous.
29 CFR 1926.405(a)(2)(ii)(a)
(ii) General requirements for temporary wiring. (A) Feeders shall originate in a distribution center. The conductors shall be run as multiconductor cord or cable assemblies or within raceways; or, where not subject to physical damage, they may be run as open conductors on insulators not more than 10 feet (3.05 m) apart.
29 CFR 1926.405(b)(2)
(2) Covers and canopies. All pull boxes, junction boxes, and fittings shall be provided with covers. If metal covers are used, they shall be grounded. In energized installations each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.
Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.