OSHA SearchOSHA records by employer

Multi Packaging Solutions: OSHA inspections and violations

Centennial, Colorado · Commercial Printing (except Screen and Books) · NAICS 323111

1inspections
3citation items
$1,800current penalties
Dec 10, 2015last inspection

OSHA has inspected Multi Packaging Solutions once in Colorado.

The inspection began on Dec 10, 2015 after a complaint, in Centennial.

That inspection ended with 3 citation items: 2 serious and 1 other-than-serious.

Penalties were first proposed at $3,000 and now stand at $1,800, 40% lower after settlements or reviews.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $4,500, and Multi Packaging Solutions averages $1,800 (1 cited inspection).

Multi Packaging Solutions also files yearly injury logs with OSHA, summarized below.

Multi Packaging Solutions: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Want to know if OSHA cites Multi Packaging Solutions again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 341112605 OPENED DEC 10, 2015Closed

Complaint · Partial · Safety · 203 employees at the site · Closed Feb 1, 2016

7025 S. Fulton St. Suite 100, Centennial, CO 80112 · Commercial Printing (except Screen and Books) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.303(g)(1) · Electrical equipment, general requirements
Serious$3,000$1,800Jan 8, 2016Final
Citation 1, item 1b
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Serious$0$0Jan 8, 2016Final
Citation 2, item 1
29 CFR 1910.147(c)(1) · Lockout/tagout
Other-than-serious$0$0Jan 8, 2016Final

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2017, the Centennial site logged 5 recordable injuries or illnesses among about 132 workers: 4.3 per 100 full-time workers, against a median of 2.0 for its industry. Those cases cost 3 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
MPS Denver
Centennial · 2017
132 514.32.0

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(1)

(c) General—(1) Energy control program. The employer shall establish a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, start up or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source, and rendered inoperative.

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.303(g)(1)

(1) Space about electric equipment. Sufficient access and working space shall be provided and maintained about all electric equipment to permit ready and safe operation and maintenance of such equipment.

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.305(g)(2)(iii)

(iii) Flexible cords and cables shall be connected to devices and fittings so that strain relief is provided that will prevent pull from being directly transmitted to joints or terminal screws.

Other commercial printing (except screen and books) employers in Colorado

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.