OSHA SearchOSHA records by employer

Munoz Construction LLC: OSHA inspections and violations

Hillsboro, Oregon · Framing Contractors · NAICS 238130

19inspections
24citation items
$204,853current penalties
Sep 3, 2024last inspection

Since 2008, OSHA inspectors have visited Munoz Construction LLC in Oregon 19 times.

The most recent inspection opened on Sep 3, 2024 as a planned inspection, in Sandy and is still open.

In all, OSHA issued 24 citation items: 14 serious, 1 willful, 6 repeat and 3 other-than-serious.

The proposed penalties came to $205,278; today they stand at $204,853, 0% less.

The rule cited most here is 7031.5010 (), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Munoz Construction LLC averages $12,919 across 10 cited inspections.

Munoz Construction LLC: OSHA citation items per year, 2008 to 2024
Citation items per year, by inspection date.

Want to know if OSHA cites Munoz Construction LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 347729451 OPENED SEP 3, 2024Open

Planned · Partial · Safety · 6 employees at the site · Open

41485 Metolius Ave, Sandy, OR 97055 · Framing Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection so far.

Inspection 347671877 OPENED AUG 6, 2024Closed

Planned · Partial · Safety · 4 employees at the site · Closed Oct 29, 2025

41613 Warm Springs St, Sandy, OR 97055 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-001-0760(1)(A)-1
Serious$2,305$2,000Sep 24, 2024Final

Inspection 347468027 OPENED MAY 8, 2024Open

Planned · Partial · Safety · 4 employees at the site · Open

3102 S Palmetto St, Cornelius, OR 97113 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(1)
Repeat$84,996$84,996Jun 12, 2024Final

Inspection 347386161 OPENED MAR 13, 2024Open

Planned · Partial · Safety · 5 employees at the site · Open

4441 N Vancouver Ave, Portland, OR 97217 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-0134(8)(A)
Serious$1,729$1,729Apr 25, 2024Final
Citation 2, item 2
29 CFR OAR 437-003-1501(4)
Repeat$20,433$20,433Apr 25, 2024Final

Inspection 346456346 OPENED DEC 13, 2022Closed

Planned · Partial · Safety · 3 employees at the site · Closed May 19, 2023

2902 Nw Covey Run, Corvallis, OR 97330 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(1)
Repeat$8,125$8,125Mar 14, 2023Final

Inspection 346347594 OPENED OCT 12, 2022Closed

Complaint · Partial · Safety · 3 employees at the site · Closed May 5, 2023

Lot 91 17th St, Lafayette, OR 97127 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-0503(1)(B)(C)
Serious$185$185Jan 27, 2023Final
Citation 2, item 2
29 CFR OAR 437-003-1501(1)
Repeat$3,250$3,250Jan 27, 2023Final

Inspection 345456297 OPENED JUL 31, 2021Closed

Planned · Partial · Safety · 7 employees at the site · Closed Jan 15, 2022

28905 Magnolia Dr, Hillsboro, OR 97123 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(4)
Serious$875$875Aug 26, 2021Final
Citation 2, item 2
29 CFR OAR 437-003-1501(1)
Repeat$3,000$3,000Aug 26, 2021Final

Inspection 344941240 OPENED SEP 23, 2020Closed

Planned · Partial · Safety · 2 employees at the site · Closed Jul 20, 2021

16163 Sw Vance Ln, Beaverton, OR 97078 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$1,500$1,500Oct 14, 2020Final
11 older inspections

Inspection 343163424 OPENED MAY 15, 2018Closed

Planned · Complete · Safety · 4 employees at the site · Closed Dec 7, 2018

19992 Sw 62nd Ter, Tualatin, OR 97062 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(1)
Serious$1,500$1,500Aug 13, 2018Final
Citation 2, item 2
29 CFR OAR 437-003-0503(2)(A)-1
Other-than-serious$0$0Aug 13, 2018Final

Inspection 342767308 OPENED NOV 13, 2017Closed

Planned · Partial · Safety · 6 employees at the site · Closed Dec 29, 2017

33264 Havlik Dr, Scappoose, OR 97056 · Framing Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341836047 OPENED OCT 13, 2016Closed

Planned · Partial · Safety · 4 employees at the site · Closed Mar 20, 2017

13310 Sw Doe Ln, , OR 97229 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(3)
Serious$1,400$1,400Nov 17, 2016Final

Inspection 341748960 OPENED AUG 30, 2016Closed

Unprogrammed other · Partial · Safety · 9 employees at the site · Closed Feb 28, 2017

5336 Se Thorn Apple St Lot 51, Hillsboro, OR 97123 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1052(c)(1)(i) · Stairways in construction
Serious$200$200Sep 16, 2016Final

Inspection 317703700 OPENED SEP 16, 2014Closed

Planned · Partial · Safety · 8 employees at the site · Closed Oct 1, 2014

18505 Sw Huntington Ln, Sherwood, OR 97140 · Framing Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 317703718 OPENED SEP 16, 2014Closed

Planned · Complete · Safety · 8 employees at the site · Closed Jul 20, 2015

21648 Sw Derby Ter, Sherwood, OR 97140 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$840$840Nov 26, 2014Closed

Inspection 317072882 OPENED AUG 19, 2013Closed

Planned · Partial · Safety · 5 employees at the site · Closed Jul 22, 2015

Corner Of Nw Curtis Nw Highland Ct Site #15, North Plains, OR 97133 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Other-than-serious$120$0Sep 13, 2013Final
Citation 2, item 2
29 CFR 7031501
Repeat$2,800$2,800Sep 13, 2013Final

Inspection 316717743 OPENED FEB 27, 2013Closed

Planned · Partial · Safety · 4 employees at the site · Closed Jul 22, 2015

17310 Se Negali, Portland, OR 97236 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 7031501
Willful$70,000$70,000Aug 2, 2013Final

Inspection 314435017 OPENED JUN 17, 2010Closed

Planned · Partial · Safety · 4 employees at the site · Closed Nov 3, 2010

20943 Sw Edgemont St, Beaverton, OR 97006 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$125$125Jul 19, 2010Closed
Citation 1, item 2
29 CFR 1926.28(a) · Personal protective equipment
Serious$685$685Jul 19, 2010Closed

Inspection 313960205 OPENED MAR 30, 2010Closed

Planned · Partial · Safety · 4 employees at the site · Closed Aug 11, 2010

21764 Sw Parklin Ln, Beaverton, OR 97006 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$275$275Apr 15, 2010Closed
Citation 1, item 2
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$310$310Apr 15, 2010Closed
Citation 2, item 3 Other-than-serious$0$0Apr 15, 2010Closed

Inspection 311694368 OPENED FEB 7, 2008Closed

Planned · Partial · Safety · 9 employees at the site · Closed Jun 26, 2008

119 Ne Alantic St, Hillsboro, OR 97124 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 7031501
Serious$625$625Feb 21, 2008Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.1052(c)(1)(i)

(i) At least one handrail; and

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(1)

(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.

29 CFR 1926.28 · Personal protective equipment

29 CFR 1926.28(a)

(a) The employer is responsible for requiring the wearing of appropriate personal protective equipment in all operations where there is an exposure to hazardous conditions or where this part indicates the need for using such equipment to reduce the hazards to the employees.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 7030.4040

29 CFR 7030.5030

29 CFR 7031.5010

Other framing contractors employers in Oregon

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.