OSHA SearchOSHA records by employer

Nea Construction Corp.: OSHA inspections and violations

Naponoch, New York · Residential Remodelers · NAICS 236118

3inspections
15citation items
$15,488current penalties
May 31, 2018last inspection

Since 1991, OSHA inspectors have visited Nea Construction Corp. in New York 3 times.

The most recent inspection opened on May 31, 2018 as part of a related case, in Southold.

In all, OSHA issued 15 citation items: 15 serious.

The proposed penalties came to $21,088; today they stand at $15,488, 27% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 4 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Nea Construction Corp. averages $11,088 across 1 cited inspection.

Nea Construction Corp.: OSHA citation items per year, 1991 to 2018
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

356employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch Nea Construction Corp. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343193462 OPENED MAY 31, 2018Closed

Unprogrammed related · Partial · Safety · 3 employees at the site · Closed Oct 24, 2022

405 Lake Ave., Southold, NY 11971 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,772$2,772Nov 20, 2018Final
Citation 1, item 2
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$2,772$2,772Nov 20, 2018Final
Citation 1, item 3
29 CFR 1926.451(f)(6) · Scaffolds, general requirements
Serious$2,772$2,772Nov 20, 2018Final
Citation 1, item 4a
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$2,772$2,772Nov 20, 2018Final
Citation 1, item 4b
29 CFR 1926.454(a) · Scaffold training
Serious$0$0Nov 20, 2018Final

Inspection 339230252 OPENED JUL 17, 2013Closed

Planned · Complete · Safety · 4 employees at the site · Closed Jan 20, 2016

249-08 Thebes Ave, Little Neck, NY 11362 · Residential Remodelers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.100(a) · Hard hats in construction
Serious$2,000$1,000Dec 19, 2013Final
Citation 1, item 1b
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Serious$0$0Dec 19, 2013Final
Citation 1, item 2a
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$2,000$1,000Dec 19, 2013Final
Citation 1, item 2b
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$0$0Dec 19, 2013Final

Inspection 109118968 OPENED NOV 6, 1991Closed

Referral · Complete · Safety · 3 employees at the site · Closed Jun 30, 1993

Eastern Correctional Facilities, Naponoch, NY 12548 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Serious$450$180Jan 13, 1992Final
Citation 1, item 2
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Serious$450$180Jan 13, 1992Final
Citation 1, item 3
29 CFR 1926.651(j)(2) · Excavations
Serious$1,500$600Jan 13, 1992Final
Citation 1, item 4
29 CFR 1926.651(k)(2) · Excavations
Serious$600$240Jan 13, 1992Final
Citation 1, item 5
29 CFR 1926.651(e) · Excavations
Serious$1,500$600Jan 13, 1992Final
Citation 1, item 6
29 CFR 1926.652(a)(1) · Trench protection
Serious$1,500$600Jan 13, 1992Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(i)

(b) Branch circuits—(1) Ground-fault protection—(i) General. The employer shall use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. These requirements are in addition to any other requirements for equipment grounding conductors.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.454 · Scaffold training

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

29 CFR 1926.651 · Excavations

29 CFR 1926.652 · Trench protection

Other residential remodelers employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.